Controllable one-well lamina precipitation construction method
A technology of layered precipitation and construction method, applied in the direction of infrastructure engineering, construction, etc., can solve the problems of affecting the construction period of the project, affecting the progress of the excavation construction, and the number of wells in the foundation pit, so as to save the cost of precipitation construction, and reduce the cost of construction. The effect of improving the efficiency of excavation and reducing the number of wells
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] The embodiments of the present invention are described in detail below in conjunction with the accompanying drawings: this embodiment is implemented on the premise of the technical solution of the present invention, and detailed implementation methods and specific operating procedures are provided, but the protection scope of the present invention is not limited to the following the described embodiment.
[0040] figure 1 It schematically shows the stratum structure (the mutual positional relationship of the phreatic aquifer, the confined aquifer, and the aquifer) and the basic positions of the water filter pipe, the water stop section, and the controllable water stop device in the well of the present invention in the stratum. Among them, the water filter pipe must be two sections (or more than two sections), and the unconfined aquifer and the confined aquifer respectively have one section (or more than two sections) of the water filter pipe; In the water-resisting lay...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 