[0126] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0127] As shown in Figure 1, the construction method of the ballastless track base plate includes the following steps:
[0128] a01. Bridge deck acceptance and pre-planning evaluation;
[0129] a02. Measure the wiring of the stakeout base plate;
[0130] a03. Arrange the fixed bolt connection;
[0131] a. Lay a sliding layer of two cloths and one film on the bridge deck;
[0132] b. Lay a hard plastic foam layer at both ends of the beam joint;
[0133] c. After installing the post-cast connector;
[0134] d0. Install alveolar shear studs;
[0135] d. Install the reinforcement of the base plate;
[0136] e. Install the base plate template;
[0137] f. pouring base plate concrete;
[0138] g. After the construction of the pouring belt and the shear tooth groove, the connection of the base plate is completed.
[0139] The specific measure...