Temporary blocking agent for hydrocarbon reservoir crack
A technology for oil and gas reservoirs and temporary plugging agents, which is applied in drilling compositions, chemical instruments and methods, etc., can solve the problems of poor temporary plugging pertinence, narrow temporary plugging range, and low temporary plugging rate, etc. The effect of shielding temporary blocking, wide temporary blocking range, and small addition amount
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0011] Embodiment 1, oil and gas reservoir fracture temporary plugging agent is produced according to the following proportioning and process:
[0012] (1) 15% of 1000 order calcium carbonate, 10% of 600 order calcium carbonate, 15% of 400 order calcium carbonate, 20% of 100 order calcium carbonate, and 5% of 60 order calcium carbonate are mixed in the reactor, stirred for 1~2 hours, The temperature is controlled at 20-40°C.
[0013] (2) Add 20% of plant fibers smaller than 2mm into (1) and mix evenly, stir for 0.5-1 hour, and control the temperature at 20-40°C.
[0014] (3) Mix and disperse 15% oxidized asphalt into (2) uniformly and stir for 0.5-1 hour, and control the temperature at 20-40°C.
[0015] The performance index of the temporary plugging agent gained in the present embodiment is as follows after testing:
[0016] project
Embodiment 2
[0017] Embodiment 2: The oil and gas reservoir fracture temporary plugging agent is produced according to the following proportions and industrial production:
[0018] (1) 15% of 1000 order calcium carbonate, 5% of 600 order calcium carbonate, 20% of 400 order calcium carbonate, 10% of 100 order calcium carbonate, 15% of 60 order calcium carbonate. Mix in the reaction kettle and stir for 1 to 2 hours.
[0019] (2) Add 15% plant fiber into (1) and mix evenly, and stir for 0.5-1 hour.
[0020] (3) Mix and disperse 20% oxidized asphalt into (2) evenly and stir for 0.5-1 hour.
[0021] The performance index of the temporary plugging agent gained in the present embodiment is as follows after testing:
[0022] project
[0023] The present invention is actually applied in Well 565 of Chuanxiao Well and Well of Chuanjiang 566. After adding the fracture temporary plugging agent of the present invention, it has a good leak prevention and plugging effect, and there are no do...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com