A technology for construction waste and river ponds, which is applied in construction, soil protection, infrastructure engineering and other directions, can solve problems such as hidden dangers of construction site and operator safety, pile breaking accidents, heavy workload, etc., to save sludge treatment costs, The effect of saving emission cost and good stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment
[0011] The composition of construction waste used for foundation backfill is mainly a mixture of bricks, tiles, concrete blocks, mortar blocks and their debris and dust. The particle size is generally required to be no more than 200mm, and large pieces of construction waste must be crushed. After use, it must not contain impurities such as organic substances and plastics.
[0012] Construction machinery: Backhoe excavators and construction waste handling facilities.
[0013] Construction method:
[0014] (1) Drain the water in the pond;
[0015] (2) Transport the construction waste to the area to be backfilled, dig up the construction waste with a backhoe excavator, and throw it into the river pond silt along the edge of the river pond. After the construction waste is placed on the surface of the silt, use a backhoe excavator Squeeze down hard, due to the high fluidity of the silt, the silt is squeezed out by the construction waste, and part of the silt is filled in the gaps...
specific example
[0019] Three groups in a residential area cover an area of 40,000m 2 , of which 2000m of unorganized backfilled ponds 2 (It was landfilled by domestic waste before demolition and construction waste after demolition). During the construction, it could only be disposed of by replacement and replacement with clay. The total cost was 260,000 yuan, and it took half a year to complete the treatment; the nine groups of adjacent projects Covers an area of 60000m 2 , of which the pond water area is 50,000m 2 , used the demolished construction waste as backfill to carry out silt squeeze treatment, which met the design requirements, the total cost was only 530,000 yuan, and it took only half a year; another nearby project did not deal with unorganized backfill, and used C70 high-strength Prestressed pipe pile foundation, during the piling construction, due to the hard surface and soft middle, the integrity test was carried out after the pile was driven, and it was found that all th...