Full-range sand-adding yield increase construction method for oil well

A construction method and a whole-process technology, applied in earthwork drilling, wellbore/well components, and production fluids, etc., can solve problems such as difficult-to-control joints, high sand plugging rate, and difficult fluid drainage, so as to save construction costs and reduce pollution , the effect of increasing benefits

Inactive Publication Date: 2009-09-16
崔彦立
View PDF0 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Therefore, construction according to the conventional sandstone construction mode is not suitable for this type of reservoir. The mechanism of fluid loss and other aspects is complex, and technical problems such as high stress, high fluid loss, high fracture internal distortion, and difficult-to-control fractures will occur during construction; ② High sand plugging rate (25.4%) and high proportion of pre-fluid (55.2%) , low sand-to-liquid ratio (25%), short validity period (35-76d), difficult drainage, large investment, poor economy, etc.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Full-range sand-adding yield increase construction method for oil well
  • Full-range sand-adding yield increase construction method for oil well
  • Full-range sand-adding yield increase construction method for oil well

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0027] The construction method for the whole process of adding sand to increase production of the oil well includes the following steps: (1) Select volcanic rock cavernous or loose sandstone porous or fractured reservoirs, start the injection pump, and set a temperature of 1.5-2m 3 The initial displacement speed of / min is injected into the oil well through the injection tubing, and the displacement is gradually increased to 3-4.5m 3 / min; Gradually increase the injection pressure at the same time to gradually increase the casing pressure by 2-3Mpa; (2) When the injection volume reaches one or two injection tubing string volumes and the injection fluid enters the formation, start adding sand to the injection fluid Gradually increase the sand ratio, which refers to the percentage of the sand volume in the injection liquid to the volume of the injection liquid. The adjustment range of the sand ratio is controlled at 5-10%, and the sand volume is 2-3.5m. 3 ; At the same time graduall...

Embodiment 2

[0028] For volcanic cavernous reservoirs, the steps of the oil well's full sand addition and production stimulation construction method are as follows: ①Start the injection pump and set a 2m 3 / min initial displacement speed is injected into the oil well, and the displacement is gradually increased to 3-4.5m 3 / min, the displacement lifting speed is 2-2.5m 3 / 5min; At the same time, gradually increase the injection pressure to gradually increase the casing pressure by 2-3Mpa; ②When the injection volume reaches the volume of two injection pipe strings and the injection fluid enters the formation, start adding sand to the injection fluid. The starting sand ratio is 5% and gradually increase the sand ratio, the adjustment range of sand ratio is controlled within 5-10%, and the amount of sand reaches 2-3.5m 3 , In order to ensure that the artificial fracture length extends over the near-well zone; at the same time, the injection pressure is gradually increased to gradually increase the...

Embodiment 3

[0032] For volcanic cavernous reservoirs, the steps of the oil well's full sand addition and production stimulation construction method are as follows: ①Start the injection pump and set a temperature of 2m 3 The initial displacement speed of / min is injected into the oil well, and the displacement is gradually increased to 4m 3 / min, the displacement lifting speed is 2.2m 3 / 5min; At the same time, gradually increase the injection pressure to gradually increase the casing pressure by 2.5Mpa; ②When the injection volume reaches the volume of two injection pipe strings and the injection fluid enters the formation, start adding sand to the injection fluid, and the starting sand ratio is 5 % And gradually increase the sand ratio, the adjustment range of sand ratio is controlled within 5-10%, and the sand volume reaches 3m 3 , To ensure that the artificial fracture length extends over the near-well zone; at the same time, the injection pressure is gradually increased to gradually increa...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a full-range sand-adding yield increase construction method for an oil well, which comprises the following steps of: (1) selecting a reservoir with a volcanic cave type or a loose sandstone pore type or a fractured type, starting an injector pump, injecting an injected fluid at an initial displacement speed of between 1.5 and 2 m<3> / min, gradually increasing the displacement to be between 3 and 4.5 m<3> / min, and ensuring that the pressure of a bushing is gradually improved by between 2 and 3 MPa; (2) beginning to add sand and improving the sand ratio when the amount of the injected fluid reaches one or two pipe column volumes and the injected fluid enters the stratum, controlling the range of the sand ratio to be between 5 and 10 percent and the sand amount to be between 2 and 3.5 m<3>, and ensuring that the pressure of the bushing is improved by between 4 and 6 MPa; and (3) stabilizing the pumping displacement, adding the sand according to the range of the sand ratio of between 15 and 80 percent and the gradual increase of 5 percent for each adding in the whole process, ensuring the sand amount reaches between 2.5 and 4 m<3> at a sand ratio section of between 20 and 25 percent, and making the pressure of the bushing gradually improved by between 6 and 15 MPa. The method has the advantages that: the method improves the ability that oil gas flows into the well; the success ratio of the construction reaches over 95 percent, the liquid efficiency is improved by over 45 percent, the average yield increase of an individual well is between 350 and 550 tons, the construction cost is saved by between 150 and 200 thousand yuan, and the benefit is increased by between 300 and 500 thousand yuan; and the method solves the technical problems shown in non-continuous medium reservoirs such as high filtration loss and the like.

Description

Technical field [0001] The invention belongs to an oilfield production increase technology, and particularly relates to a construction method for the whole process of adding sand to increase production of an oil well. Background technique [0002] At present, hydraulic fracturing stimulation methods are commonly used in oil fields to increase the production of oil wells. The hydraulic fracturing stimulation method is developed based on the sandstone reservoir of cement strength. The hydraulic fracturing mechanics mechanism is based on the fracture mechanics of the continuous homogeneous medium in the material mechanics. The process is to use 30-60% of the total injected liquid as The fracture-forming liquid first forms hydraulic fracturing fractures in the rock formation, and then mixes sand into the injected liquid to bring it into the cracked cracks. When the injected liquid is filtered and lost to the rock formation, the brought sand supports the hydraulically compressed crack...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E21B43/25
Inventor 崔彦立王玉成
Owner 崔彦立
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products