A production method and tunnel technology, applied in the production field of flexible ventilation ducts, can solve the problems of limited ability to withstand strength and pressure, long mesh production process, long process flow, etc. The effect of saving manpower and time and ensuring the quality of the air duct
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0016] see figure 1 , the present embodiment production method comprises the following steps:
[0017] 1) Installation equipment: install the first extruder 1, the bottom film mold 4, the second extruder 6 and the traction mechanism 7 in sequence on the production site, and the two ends of the bottom film mold 4 are respectively located at the first extruder 1 and the second extruder In the second extruder 6, the middle part of the bottom film mold 4 is the position outside the body of the first extruder 1 and the second extruder 6. To the laying mechanism 3. The warp-laying mechanism is to be provided with warp yarns between the first extruder 1 and the base film mold 4; the weft-direction network laying mechanism 3 is to be provided with an annular ring around the circumferential direction of the base film mold 4, on the annular ring Arrange the weft yarns. Winding device 8 is installed at the outlet of traction mechanism 7 .
[0018] 2) Extrude the bottom film: determin...
Embodiment 2
[0023] see figure 2 , the present embodiment production method comprises the following steps:
[0024] 1) Installation equipment: install the first extruder 1, the bottom film mold 4, the second extruder 6 and the traction mechanism 7 in sequence on the production site, and the two ends of the bottom film mold 4 are respectively located at the first extruder 1 and the second extruder In the second extruder 6, the middle part of the bottom film mold 4 is the position outside the body of the first extruder 1 and the second extruder 6. To the laying mechanism 3. The warp-laying mechanism is to be provided with warp yarns between the first extruder 1 and the base film mold 4; the weft-direction network laying mechanism 3 is to be provided with an annular ring around the circumferential direction of the base film mold 4, on the annular ring Arrange the weft yarns. An annular glue spraying device 5 is installed between the base film mold 4 and the second extruder 6 . Winding de...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 