SBS modified asphalt and preparation method thereof
A technology of modified asphalt and asphalt, applied in the direction of climate sustainability, sustainable waste treatment, solid waste management, etc., can solve the problems of softening point and aging effect that cannot meet the requirements, high production cost, etc., and achieve long-term storage and use , fast response, good anti-aging performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] Example 1: 500g of asphalt, 17.5g of star-shaped SBS, 25g of extension agent and 0.25g of stabilizer.
[0020] Preparation method: (1) To prepare the extension agent, mix rubber softening oil with diallyl phthalate, and then stir at 120°C for 1.5 hours;
[0021] (2) To prepare a stabilizer, mix the accelerator tetrabutylthiuram sulfide with antioxidant 1076, and then stir at 65°C for 1 hour;
[0022] (3) To prepare SBS modified asphalt, heat 500g of asphalt to 165°C, add 17.5g of star-shaped SBS and 25g of the extension agent prepared in step (1) after the asphalt is dissolved, and pass through the colloid mill after the star-shaped SBS and extension agent are dissolved Grind, then stir for 2 hours, then add 0.25 g of the stabilizer prepared in step (2), and continue stirring for 4 hours.
Embodiment 2
[0023] Example 2: 500g of asphalt, 25g of star-shaped SBS, 5g of extension agent and 1g of stabilizer.
[0024] Preparation method: (1) To prepare the extension agent, mix rubber softening oil with diallyl phthalate, and then stir at 130°C for 1 hour;
[0025] (2) To prepare a stabilizer, mix the accelerator tetrabutylthiuram sulfide with antioxidant 1076, then stir at 70°C for 0.8 hours;
[0026] (3) To prepare SBS modified asphalt, heat 500g of asphalt to 175°C, add 25g of star-shaped SBS and 5g of the extension agent prepared in step (1) after the asphalt is dissolved, and then undergo high-speed shearing after the star-shaped SBS and extension agent are dissolved Machine mixed at 3000 rpm for 30 minutes, then stirred for 2.5 hours, then added 1 g of the stabilizer prepared in step (2), and continued to stir for 3 hours.
Embodiment 3
[0027] Example 3: 500g of asphalt, 12.5g of star-shaped SBS, 15g of extension agent and 0.45g of stabilizer.
[0028] Preparation method: (1) To prepare the extension agent, mix rubber softening oil with diallyl phthalate, and then stir at 140°C for 0.5 hours;
[0029] (2) To prepare a stabilizer, mix the accelerator tetrabutylthiuram sulfide with antioxidant 1076, then stir at 75°C for 0.5 hours;
[0030] (3) To prepare SBS modified asphalt, heat 500g of asphalt to 180°C, add 12.5g of star-shaped SBS and 15g of the extension agent prepared in step (1) after the asphalt is dissolved, and pass through the colloid mill after the star-shaped SBS and extension agent are dissolved Grind, then stir for 3 hours, then add 0.45 g of the stabilizer prepared in step (2), and continue stirring for 2 hours.
[0031] Comparative experiment 1: Add 500 grams of asphalt into a stainless steel cup, heat it to 175°C, add 17.5 grams of star-shaped SBS into the cup, stir it with a strong mixer fo...
PUM
Property | Measurement | Unit |
---|---|---|
softening point | aaaaa | aaaaa |
softening point | aaaaa | aaaaa |
softening point | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com