Determination method of deep tunnel roof support forms and support depth
A technology of roadway roof and determination method, which is applied in the directions of earthwork drilling, wellbore/well components, measurement, etc., can solve the problem of not using bolt support, etc., and achieve the effect of economical and reasonable support parameters
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] Now in conjunction with the accompanying drawings and taking a certain mine as an example, the technical scheme of the present invention will be described in detail.
[0030] 1. First, according to figure 1 and figure 2 The drill holes are laid out as shown, and the images in the holes are actually measured and calculated to determine the structural zone, the details are as follows:
[0031] (1) Determine the 100-meter survey area along the direction of the roadway 2. On the roof 3 axis, drill a borehole 6 every 20m, and drill six boreholes 1#, 2#, and 3# in the 100m survey area , 4#, 5#, 6# (such as figure 2 ), the borehole 6 is 10.5m deep and 43mm in diameter, and an intelligent borehole imager 1 is arranged in the roadway 2 .
[0032] (2) Turn on the intelligent borehole imager 1, make it in the recording state, and clear it;
[0033] (2) Utilize the guide rod 4 to advance the color camera 5 along the axis of the borehole 6 until it reaches the bottom of the bo...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com