Limestone mountain sand baking-free building block and production process thereof
A production process and technology for sandy soil, applied in the field of Shifenshan sandy soil unburned block and its production process, can solve the problems of energy consumption, no obvious improvement in strength, damage to cultivated land, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0009] 1. Weigh each material in proportion: 10 parts by weight of curing agent, 90 parts by weight of Shifenshan sandy soil, and 10 parts by weight of water; 2. Stirring: Add curing agent and dry mix for 2 to 3 minutes in the Shifenshan sandy soil, then Add water for wet mixing for 2 to 3 minutes, and input the brick machine mold after discharge. 3. Vibration molding: Vibration and pressure for 5 to 20 seconds, the surface of the formed brick should be slightly bleed; 4. Demoulding; 5. Quality inspection; 6. Maintenance: when the ambient temperature is ≥20°C, keep it moist for 14 days; when the ambient temperature is less than 20°C, keep it moisturized for 7 days; when the humidity is less than 75% in natural conservation, sprinkle water on the surface of the brick pile for maintenance, and sprinkle water in the morning, middle and evening 1 time, get the finished product.
Embodiment 2
[0011] 1. Weigh each material in proportion: 8 parts by weight of curing agent, 92 parts by weight of Shifenshan sandy soil, and 10 parts by weight of water; 2. Stirring: add curing agent to dry mix for 2 to 3 minutes in the Shifenshan sandy soil, then Add water for wet mixing for 2 to 3 minutes, and input the brick machine mold after discharge. 3. Vibration molding: Vibration and pressure for 5 to 20 seconds, the surface of the formed brick should be slightly bleed; 4. Demoulding; 5. Quality inspection; 6. Maintenance: when the ambient temperature is ≥20°C, keep it moist for 14 days; when the ambient temperature is less than 20°C, keep it moisturized for 7 days; when the humidity is less than 75% in natural conservation, sprinkle water on the surface of the brick pile for maintenance, and sprinkle water in the morning, middle and evening 1 time, get the finished product.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More