Method for blasting closed rock of shield tunnel in complex strata
A technology of shield tunneling and composite ground, applied in the field of building construction, can solve problems such as difficulty in meeting construction requirements, high construction noise, high construction cost, etc., and achieve the effects of ensuring integrity and stability, saving time, and facilitating construction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0027] The new technology of closed rock mass blasting for shield tunneling in composite strata, the method steps are as follows:
[0028] (1): Design and hole layout: According to the geological exploration situation provided, design the drilling hole spacing, row spacing and hole depth, and adopt rectangular or plum-shaped hole layout;
[0029] First, select the edge of the rock mass or the thinner area of the rock mass for hole blasting. The first blasting area squeezes the surrounding soil to form a cavity, which provides a free surface for the post-blasting area, and then proceeds to the center area of the rock mass and the thicker area in turn. For drilling and blasting, rectangular or quincunx-shaped holes can be used. If the boulders are small, the one-time drilling is completed and blasting is carried out; when the boulders are large, drilling and blasting can be started from the edge of the boulders in batches. The spacing and hole layout method can be gradually...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com