[0002] Existing e-commerce applications, for the part of house decoration, only provide commercial advertisements to emphasize the company's design and planning capabilities or contract performance; while the supply of appliances and materials strengthens the superiority and application functions of products, and only displays and sells business. But there is no necessary planning and design for the current situation and application requirements of the demand-side houses; however, house decoration must go to the site for re-evaluation, and appliance purchases must go to the appliance sales point for review and evaluation, all of which require a lot of manpower and money, and
neglect the house. The uniqueness and application requirements of homeowners, and more importantly, house decoration is mostly carried out by individuals, with many work items and a small
workload, which needs to be combined with multiple professional executions, resulting in the inability of large-scale companies to concentrate on it, making contractors mostly small contractors Most of the jobs are temporary workers, so there are inevitably many deficiencies in the operation, the contracting operation is difficult, and it is impossible to effectively control and track. Other common deficiencies are as follows:
[0003] 1. House decoration involves many professions and construction methods, and there is no professional open channel to ask and compare. The homeowner is not clear about the decoration procedure and construction content, and the general decoration operation and the purchase of related appliances are separate operations, so the decoration process is mastered It is not easy, and the lack is often discovered during the actual installation of the appliance. It needs to be modified and modified to increase the construction cost, and it is impossible to effectively plan, track and control
[0004] 2. There are so many house decoration contents that the homeowner cannot express clearly, so the pre-renovation evaluation work must be done on-site inspection and
estimation, involving many and complicated projects, and various disciplines cannot be evaluated and negotiated at the same time, there are duplications or omissions, and the combination of operations is often Being temporary, it is more likely to cause blind spots in construction, and more seriously, during the decoration process, the connection work of various constructions must be checked on site,
wasting a lot of time and money
[0005] 3. There are many house decoration items, involving various professions (such as mud work,
ironwork, formwork, electrician, plumbing, paint,
fire protection,
air conditioning, communication and related equipment installers, etc., although designers can be entrusted to plan Construction supervision, but with limited professional ability and decoration funds, it is impossible to invest a lot of manpower and time for
comprehensive planning; and the construction content is diverse and small, large companies cannot undertake small projects, and small-scale companies cannot seek perfect professional planning companies
[0006] 4. There are many house decoration projects, communication is difficult, and the connection work in the construction must be inspected by the operator, which is time-consuming and laborious. Face-to-face communication is only carried out during the connection, and the problem emerges, and the owner is not clear about the decoration requirements. The price chasing situation occurred, which led to modification and modification during the implementation process, resulting in constant conflicts
[0007] 5. The content of decoration construction and the
simulation of appliance procurement and operation cannot be carried out synchronously, and it is easy to miss or discover errors due to specifications during appliance installation, such as discrepancies in expected dimensions, wrong socket locations, incorrect locations of inlet and outlet, and incorrect installation locations of lamps and lanterns. Mistakes, etc., modification and modification will only increase the decoration cost
[0009] 7. The valuation content and actual construction involve multiple disciplines. The owner and the design supervisor may not be clear about the real content. There are often situations such as increased reporting hours and increased usage. After the decoration construction, a large amount of materials and waste are left
[0013] It can be seen that there are still many deficiencies in the above-mentioned existing system, which is not a good design and needs to be improved urgently.