Treatment method for slowing gully erosion
A gully and ditch head technology, which is applied in the field of buffer ditch erosion control, can solve the problems of high cost and poor treatment effect, and achieve the effects of buffer ditch erosion reduction, reasonable and ingenious design, and strong comprehensiveness
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] A treatment method for reducing buffer gully erosion, the method is composed of four parts: gully selection, ditch head treatment, ditch bottom treatment and ditch head wall treatment, and its specific steps are as follows:
[0020] 1. The choice of the gully, the slope of the left gully wall of the selected gully is 45° and the height of the gully head wall is 5 meters;
[0021] 2, ditch head control, plant Jatropha curcas and mulberry plants above the ditch head to form a buffer plant hedge strip above the ditch head, the buffer plant hedge strip above the ditch head is an inverted U shape, and the bandwidth of the buffer plant hedge strip is 2 meters, the U-shaped mouth of the inverted U is opposite to the ditch head, the width of the U-shaped mouth of the inverted U is 1.5 meters wider than the width of the ditch head, and the distance between the top of the inverted U-shaped curve and the ditch head The vertical distance is 5 meters, and 5 5-year-old Leucaena trunk...
Embodiment 2
[0025] Embodiment 2 and Embodiment 3 are the same as Embodiment 1 except that the following measures are different, and will not be repeated here.
[0026] Example 2
[0027] 1. The choice of the gully, the slope of the left gully wall and the right gully wall of the gully is 30° and the height of the gully head wall is 4 meters;
[0028] 2. Ditch head control, the width of the buffer plant hedge strip above the inverted U-shaped ditch head is 1.5 meters, and the width of the U-shaped mouth of the inverted U is 1 meter wider than the width of the ditch head, and the inverted U-shaped The vertical distance between the top of the curve and the head of the ditch is 4 meters, and 4 wooden piles are embedded in the inverted U-shaped curved section of the buffer plant hedge strip above the head of the ditch;
[0029] 3, ditch bottom control, the vertical distance between the U-shaped curve bottom of the U-shaped ditch bottom buffer plant hedge strip and the ditch head is 4 meters, ...
Embodiment 3
[0032] 1. The choice of the gully, the slope of the right gully wall of the gully is 25° and the height of the gully head wall is 2 meters;
[0033] 2. Ditch head control, the bandwidth of the buffer plant hedge strip above the inverted U-shaped ditch head is 1 meter, the width of the U-shaped mouth of the inverted U-shaped is equal to the width of the ditch head, and the curve of the inverted U-shaped The vertical distance between the top and the ditch head is 3 meters, and 3 wooden stakes are embedded in the inverted U-shaped curved section of the buffer plant hedge above the ditch head;
[0034] 3. Ditch bottom management, the vertical distance between the bottom of the U-shaped curve of the U-shaped ditch buffer plant hedge strip and the ditch head is 3 meters, and the bandwidth of the ditch bottom buffer plant hedge strip is 2 meters;
[0035] 4. Treatment of the ditch head wall, plant pomegranates and embed 3 wooden stakes on the land between the ditch head and the buffe...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com