Construction method of super-long advanced anchor bars
A bolt construction, super-long technology, applied in the installation of bolts, drilling equipment and methods, earthwork drilling and mining, etc., can solve the problems affecting the construction progress, poor support effect, etc., to improve safety and easy to promote , The effect of simple operation process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0020] The construction method of the ultra-long advanced bolt comprises the following steps:
[0021] (1) Preparatory work: including working studio, building construction platform, erecting positioning arch, drilling rig in place, wherein when the drilling rig is in place, the drill pipe can pass through the reserved hole on the positioning arch, adjust the angle of the drill pipe, Then fix the position of the rig;
[0022] (2) Drilling and opening: Adjust the drilling rig according to the angle of the drill pipe before opening the hole. After the drill pipe with the impactor and the drill bit installed passes through the reserved hole of the positioning arch, the drill bit is placed on the face of the hole to be drilled. Use a ruler or connecting pipe to level the drill pipe, then adjust the drill pipe to an angle of 2° up, fix the drilling machine, and then open the air to drill;
[0023] (3) Connect the drill pipe and continue drilling: When the drill pipe is drilled 1m,...
Embodiment 2
[0029] The construction method of the ultra-long advanced bolt comprises the following steps:
[0030] (1) Preparatory work: including working studio, building construction platform, erecting positioning arch, drilling rig in place, wherein when the drilling rig is in place, the drill pipe can pass through the reserved hole on the positioning arch, adjust the angle of the drill pipe, Then fix the position of the rig;
[0031] (2) Drilling and opening: Adjust the drilling rig according to the angle of the drill pipe before opening the hole. After the drill pipe with the impactor and the drill bit installed passes through the reserved hole of the positioning arch, the drill bit is placed on the face of the hole to be drilled. Use a ruler or connecting pipe to level the drill pipe, then adjust the drill pipe to an angle of 3° up, fix the drilling machine, and then open the air to drill;
[0032] (3) Connect the drill pipe and continue drilling: when the drill pipe is drilled 1.5...
Embodiment 3
[0038] The construction method of the ultra-long advanced bolt comprises the following steps:
[0039] (1) Preparatory work: including working studio, building construction platform, erecting positioning arch, drilling rig in place, wherein when the drilling rig is in place, the drill pipe can pass through the reserved hole on the positioning arch, adjust the angle of the drill pipe, Then fix the position of the rig;
[0040] (2) Drilling and opening: Adjust the drilling rig according to the angle of the drill pipe before opening the hole. After the drill pipe with the impactor and the drill bit installed passes through the reserved hole of the positioning arch, the drill bit is placed on the face of the hole to be drilled. Use a ruler or connecting pipe to level the drill pipe, then adjust the drill pipe to an angle of 2° up, fix the drilling machine, and then open the air to drill;
[0041] (3) Connect the drill pipe and continue drilling: when the drill pipe is drilled 2m,...