Construction method for casting floor on site
An on-site pouring and floor slab technology, applied in the on-site preparation of building components, floor slabs, construction, etc., can solve the problems of unfavorable construction, high labor intensity, and low quality of floor slabs, saving social resources and energy, improving labor efficiency, The effect of simplifying the construction process
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0039] as attached Figure 1~5 As shown, it is a special-shaped formwork 1 and a mold column 5 produced in a factory. as attached figure 1 Shown is a perspective view of a flat-shaped special-shaped formwork 1, which includes a forming part 1a for forming a floor slab and a first connecting part 1b and a second connecting part 1c respectively arranged on both sides of the forming part 1a, the second connecting part 1c has a The space 1d into which the first connecting part of the special-shaped formwork is inserted, of course, the space is not limited to the L-shape shown in the drawings, and can be other shapes such as V-shape or U-shape. The first connection part of the latter special-shaped formwork is inserted into the space 1d of the second connection part 1c of the previous special-shaped formwork to form a plug-in structure, and after the assembly is completed, the molding part 1e of the latter special-shaped formwork and the molding of the previous special-shaped form...
Embodiment 2
[0052] Such as Figure 10-13 As shown, the present embodiment is the specific steps of the construction method of casting the "-" shaped floor slab on site by using another structure of the mold box.
[0053] The first step is to find the fixing points of several modules 6 on both sides of the beam 8, and fix the left and right modules 6a, 6b symmetrically on the two sides of the beam 8 respectively (modules 6a, 6b can also be connected with the beam 8 when making the beam) Integral molding), and slightly higher than the upper end surface of the beam 8 (as attached Figure 10 shown);
[0054] In the second step, the two ends of the keel 7 are placed on the upper end surface of the right module 6b of a crossbeam and the left module 6a of the adjacent crossbeam, and the keel 7 is horizontal to the ground and perpendicular to the crossbeam 8 (as attached Figure 10 , 11 shown);
[0055] The 3rd step, the special-shaped formwork 1 that factory produces is close to left and rig...