Compound clear water tunnel stone slab and manufacturing method as well as application thereof
A technology of composite panels and slates, which is applied in covering/lining, construction, building construction, etc., can solve the problems that the appearance is not fresh and simple, not natural enough, and affect the beauty of decorations, etc., and achieve the effect of fresh and natural appearance of the panels
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] A preparation method for a composite clear water hole stone slab, comprising the following steps:
[0027] (1) Apply an interface agent (Degao Building Materials Co., Ltd., DG-JMJ; the same below) on the surface of the cement fiber base plate, the thickness of the interface agent layer is 30 μm, and the composite board A is obtained;
[0028] (2) Install two fixed side strips with a height of 2 mm on a group of parallel sides of the side of the composite plate A clothed with interface agent, cloth the middle layer material, and then scrape off the middle layer material higher than the fixed side strips, and then scrape Natural holes and textures are formed during the movement;
[0029] (3) After the middle layer material is completely dry, polish it with 320-mesh sandpaper, and blow off all the dust in the hole with a high-pressure air nozzle to expose the hole;
[0030] (4) Roll and apply a slightly dark emulsion (SKK weak solvent polyurethane matte finish paint, Shik...
Embodiment 2
[0032] A preparation method for a composite clear water hole stone slab, comprising the following steps:
[0033] (1) Roll coating an interface agent on the surface of the calcium silicate base plate, the thickness of the interface agent layer is 10 μm, to obtain the composite board A;
[0034] (2) Install two fixed side strips with a height of 3 mm on a group of parallel sides of the side of the composite plate A clothed with interface agent, cloth the middle layer material, and then scrape off the middle layer material that is higher than the fixed side strips. Natural holes and textures are formed during the movement;
[0035] (3) After the middle layer material is completely dry, polish it with 320-mesh sandpaper, and blow off all the dust in the hole with a high-pressure air nozzle to expose the hole;
[0036] (4) Roll on the middle layer material and apply a matte slightly dark silicone acrylic emulsion. After the silicone acrylic emulsion is dry, use 320 mesh sandpaper...
Embodiment 3
[0038] A preparation method for a composite clear water hole stone slab, comprising the following steps:
[0039] (1) Spraying an interface agent on the surface of the ceramic base plate, the thickness of the interface agent layer is 40 μm, to obtain the composite plate A;
[0040] (2) Install two fixed side strips with a height of 1mm on a group of parallel sides of the side of the composite plate A clothed with interface agent, cloth the middle layer material, and then scrape off the middle layer material that is higher than the fixed side strips. Natural holes and textures are formed during the movement;
[0041] (3) After the middle layer material is completely dry, polish it with 320-mesh sandpaper, and blow off all the dust in the hole with a high-pressure air nozzle to expose the hole;
[0042] (4) Roll and apply a matte slightly dark pure acrylic emulsion on the material of the middle layer. After the pure acrylic emulsion dries up, use 320 mesh sandpaper for the seco...
PUM
| Property | Measurement | Unit |
|---|---|---|
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
| thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 