Handling a scheduling request trigger
A scheduling request and processing scheduling technology, applied in wireless communication, electrical components, etc., can solve the problem that user equipment must wait
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] As part of this disclosure, problems will first be identified and discussed. As mentioned above, it was recently decided that all pending SRs will be canceled if UL-SCH resources are available for a new transmission in a TTI as it is in a TTI when UL-SCH is available or when a PDCCH grant is received, It is considered ambiguous when UL-SCH resources are granted. Now consider the case where a pending SR trigger is canceled in a TTI when UL-SCH resources are available, ie when new data is transmitted, according to the most recent decision.
[0038] figure 1 An analysis showing an alternative cancellation of a scheduling request while transmitting UL data when new second data arrives at the user equipment buffer before a grant for the first data is received. Assume that the following operations have been performed: the first data has arrived at the user equipment buffer. This first data has triggered a buffer status report. This first data also directly or indirectly t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 