Method for installing main body frame steel structure of benzene hydrogenation project

A technology of the main frame and installation method, which is applied in the direction of building structure, construction, and building material processing, etc. It can solve the problems of irregular installation, complicated and unreasonable manufacturing process, etc., so as to reduce the construction cost of the project and ensure the safety and reliability of the project quality , design reasonable effect

Active Publication Date: 2012-05-23
MCC5 GROUP CORP SHANGHAI
View PDF2 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the installation of the main frame steel structure of the benzene hydrogenation projects that have been built or are under construction in China is still in the non-standard stage, and there are many unscientific and unreasonable places. The production process is complicated and the production cost is high.
[0003] Therefore, there are above-mentioned inconveniences and problems in the known benzene hydrogenation project main frame steel structure installation method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0022] The steel structure installation method of the main frame of the benzene hydrogenation project of the present invention, the main frame structure of the benzene hydrogenation device is a steel structure frame, the horizontal line is from 1 to 11, the total length is 58.5m, and the basic column distance is 6m, of which the line 1 to 2 is 4.5m ; Longitudinal from column A to column E, the spans are 9m, 6m, 9m and 6m respectively, a total of 30m, column AB has only one floor, with an elevation of 4.5m, and column BC has three floors, with elevations of 4.5m, 5.3m, and 6.5m respectively , of which 5.3m is the platform of the pipe gallery. The CD axis has three floors with elevations of 4.5m, 8.1m, and 14.1m. The main structure of the DE axis has three floors with elevations of 4.5m, 8.1m, 14.1m, and 20.1m. Among them, a four-layer frame platform for fixing the extraction tower is added between the 8th and 9th axes, and there are seven layers of platforms in total. The elevat...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a method for installing a main body frame steel structure of a benzene hydrogenation project. The method is characterized by comprising the following steps of: a, dividing hoisting areas of frame steel structures, dividing hoisting areas of multi-layer and high-rise frame steel structures according to the operating range of a tower crane to ensure that steel members are hoisted sequentially and simultaneously in parallel, hoisting from the middle or a certain symmetrical panel of a plane, hoisting by taking a column grid of a panel as a hoisting unit according to the sequence of steel columns, steel beams and supports, and expanding towards the periphery; after a stable structure is formed from bottom to top in the vertical direction, installing minor structures layer by layer, namely arranging the minor structures on the steel members of each panel in each floor; b, measuring, correcting and performing initial screwing by using a high-strength bolt after the frame steel structures of a district are hoisted, measuring, correcting, performing the initial screwing by using the high-strength bolt and welding after the frame steel structures of several districts are installed, and hoisting the next section of the steel column; and c, hoisting, releasing and paving combined floor compression steel plates.

Description

technical field [0001] The invention relates to a method for installing a frame steel structure, in particular to a method for installing a frame steel structure of a main body of a benzene hydrogenation project. Background technique [0002] The process of benzene hydrogenation unit is quite special, its system is complicated, there are many equipments, the pressure and temperature of the system itself are high, and the pump equipment is not allowed to run idle. The benzene hydrogenation project is mainly divided into the central control room and substation, refining device, water supply and drainage project, air compressor station, storage and transportation facilities (tank farm and pump room), power supply for the whole plant and lighting for the whole plant, torches and ancillary projects facilities, there are special requirements for lightning protection, fire protection and explosion protection in the installation of these facilities, and the installation of the steel...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E04G21/00E04G21/14
Inventor 陈小东陈和平徐桂兰冯娜
Owner MCC5 GROUP CORP SHANGHAI
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products