Method for constructing tunnel with low-half cross section being dry powder and fine sand layers
A construction method and dry powder technology, applied in tunnels, tunnel linings, underground chambers, etc., can solve problems such as slow construction progress, poor slurry diffusion, and inability to quickly seal
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0009] The construction method of the tunnel in the lower half section is a dry powder fine sand layer, the steps are as follows: a. Advance support after measurement and setting out; Concrete and initial support; c. On the face of the dry silty sand layer at the lower part of the tunnel, a number of advanced horizontal jet grouting piles arranged in a plum blossom shape are applied. At the same time, a number of oblique jet grouting piles are constructed on the middle steps, corresponding The adjacent oblique jet grouting piles must ensure longitudinal continuous occlusion and tight upper and lower laps; d. Divide the middle step into upper and lower parts for excavation; e. Construct several oblique jet grouting piles on the lower step, The spouted piles must ensure continuous longitudinal occlusion and tight overlap between the upper and lower sides; f. Divide the lower steps into upper and lower parts for excavation; g. Excavate the tunnel bottom in sections on the left and...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com