Tunnel arch exchanging construction method and construction structure in tunnel arch exchanging construction

A construction method and technology for tunnels, which are applied to tunnels, tunnel linings, and earth-moving drilling and mining, etc., can solve problems such as danger and ineffective consolidation, reduce top blocks or landslides, improve standardized operations, and improve application prospects.

Active Publication Date: 2012-10-17
HUNAN PROVINCIAL COMM PLANNING SURVEY & DESIGN INST CO LTD
View PDF4 Cites 40 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In fact, the deformed surrounding rock may not be loose, and many projects have the problems of common static pressure grouting penetration and ineffective consolidation; in addition, the injected consolidation grout is not so much "cement slurry" as "mud-water slurry" , cement sl

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Tunnel arch exchanging construction method and construction structure in tunnel arch exchanging construction
  • Tunnel arch exchanging construction method and construction structure in tunnel arch exchanging construction
  • Tunnel arch exchanging construction method and construction structure in tunnel arch exchanging construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0044] The section of the tunnel structure is horsepower -shaped, the excavation span is 18m, the excavation height is 12m, and the arched span ratio is 0.55.The tunnel is constructed by drilling method and supports the new Olympic method.The support structure adopts a composite lining. The initial support is an anchor spraying concrete, which contains the steel skeleton.The second support is the steel concrete for the cast -in -law, which is generally implemented for about 2 to 3 months in the early stages of lag.

[0045] The construction of the tunnel adopts a three -level and seven -step excavation method, and the upper -step construction adopts a core soil ring -shaped groove method.The middle and lower steps are generally implemented in about 1 to 1.5 months.Due to the limitations of the geological situation and construction method of the tunnel, the support structure of the support structure in the early stages of the upper steps is large.The horizontal convergence value of...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a tunnel arch exchanging construction method. The tunnel arch exchanging construction method comprises the following steps of: constructing a temporary support under a tunnel transgression limit section, drilling grouting holes on arch part surfaces of tunnel primary supports, stretching steel floral tubes into the grouting holes, and grouting cement grout so as to reinforce a surrounding edge outside a tunnel excavating contour line; and setting lead tube sheds on the tunnel arch part along a circumferential direction, disassembling the primary supports finally and sequentially according to the distance of primary support steel arch frames, remaking one primary support after one primary support is disassembled, and alternately carrying out the operation of disassembling and remaking until all the arch exchanging constructions in the tunnel transgression limit section are finished. A construction structure disclosed by the invention comprises foundation beams, the temporary support and the steel arch frames, wherein foundation frames of the temporary support are arranged on the foundation beams, the top part of the temporary support is used for supporting the steel arch frames, the grouting holes and the lead tube sheds are uniformly distributed above the steel arch frames, the grouting holes are provided with the steel floral tubes, and the lead tube sheds are mainly formed by the steel floral tubes. The tunnel arch exchanging construction method and the construction structure, which are disclosed by the invention, have the advantages that the working procedure is simple and clear, the safety coefficient is high, the recovery degree of the bearing ability is quick, and the like.

Description

Technical field [0001] The present invention involves a construction method and construction structure in the construction process of a tunnel, and especially involves a construction method of a tunnel replacement and arching of tunnels. Background technique [0002] At present, the construction of highway tunnels generally adopts drilling method. The design is generally adopted by the new Olympic method, that is, make full use of the bearing capacity of the surrounding rock itself during the excavation process.The rocks were stressed together, and they deformation together. After the transformation of the surrounding rock basically converged, the secondary lining coordinated the initial support.During the initial support of the tunnel, due to poor geological conditions, when shallow, partial pressure, groundwater are developing, the construction organization is inadequate or the construction process is unreasonable, it is easy to be prone to or initial support during the tunnel ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E21D11/18E21D11/10
Inventor 任会傅立新周应麟鲁军纪刘云付
Owner HUNAN PROVINCIAL COMM PLANNING SURVEY & DESIGN INST CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products