Processing method of underground tunnel supporting column
A processing method and pillar technology, which is applied to pillars/supports, earth square drilling, mining equipment, etc., can solve the problems of environmental pollution, lack of bamboo tunnel pillars, high production costs, etc., and achieve the effect of reducing environmental pollution
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0018] Embodiment 1: the processing method of tunnel pillar, comprises the following steps:
[0019] (1) Material cutting: cut off the crooked ends formed when the roots of the original bamboo are harvested;
[0020] (2) Slicing and thread pressing: Cut the broken bamboo tube into thin bamboo slices, and then layer them. The sliced bamboo slices are pressed into bamboo silk, but the bamboo silk fibers are not broken;
[0021] (3) Cooking: Cook for 28-32 hours, control the cooking temperature at 425-435°C, and then dry until the moisture content of the bamboo shreds should be controlled below 10%; the above cooking-drying process is repeated 3 times;
[0022] (4) Glue dipping: put the dried bamboo silk in an iron cage, and forcefully put it into the glue pool filled with the prepared glue solution. The bamboo threads are all immersed in the glue solution. The glue solution composition: sodium hydroxide: 9- 11%, formaldehyde: 9-11%, phenol: 58-62%, water: 18-22%, let the bamb...