Inclined well shaft construction technology
A construction process and wellbore technology, which is applied in well sinking, shaft equipment, mining equipment, etc., can solve the problems of wellbore excavation obstacles, slow excavation speed, and high wellbore cost, so as to speed up the construction progress, reduce the amount of frozen soil, and reduce the difficulty of construction and human and material resources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0012] Embodiment of the present invention is described below in conjunction with accompanying drawing, embodiment does not constitute limitation of the present invention:
[0013] to combine figure 1 ;
[0014] The original shaft freezing process of inclined shafts is to freeze the entire shaft as a whole, including the shaft part that needs to be excavated, so that the excavation section of the shaft is all frozen soil, which cannot be opened by blasting or digging by excavators. Affected the excavation progress of mine, wasted manpower and material resources greatly, is extremely unfavorable for the construction of inclined shaft shaft.
[0015] to combine figure 2 ;
[0016] This measure is improved on the basis of the original freezing method. In order to reduce the area of frozen soil during the excavation process, we adopt block freezing, that is, the shaft wall and arch are vertically inserted into the freezing pipe for freezing; while the shaft floor is frozen f...