Method and system for optimal scheduling on joint flood control for cascade reservoir groups
A technology for optimal dispatching and cascade reservoirs, applied in water conservancy projects, climate change adaptation, water conservancy engineering equipment, etc., which can solve problems such as large amount of calculation, complex flood control dispatching of multi-reservoir series hydropower station groups, and poor accuracy.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0093] Embodiment 1 of the present invention: the present invention is applied to the flood control optimization dispatch of Wujiang cascade hydropower station group. A cascaded reservoir group joint flood control optimal dispatching system, such as figure 1 As shown, it includes: an automatic water regime monitoring system 1, a communication system 2 and a water regulation automation system 3, and the communication system 2 is connected to the water regime automatic measurement and reporting system 1 and the water regulation automation system 3 respectively.
[0094] The described water regime automatic surveying and reporting system 1 comprises: telemetry station 4, information transmission channel 5 and central control station 6, and information transmission channel 5 is connected with telemetry station 4 and central control station 6 respectively; Wherein, telemetry station 4 is used for automatic collection The real-time data of rainfall, water level and other hydrologica...
Embodiment 2
[0217] Embodiment 2 of the present invention: the system adopted in this embodiment is the same as that in Embodiment 1. Adopt pre-leaking optimization scheduling method. The basic principles of pre-release optimal scheduling are instantaneous flow balance and time-period water balance. The basic principles of dispatching are the safety principle and the economic principle, that is, not only the safety of the main reservoir, but also create conditions for the safety of the lower reservoirs, and at the same time minimize water abandonment, and make full use of the water head benefits of cascade reservoirs under the condition of no water abandonment.
[0218] mathematical model
[0219] The mathematical model of the pre-venting optimization scheduling method is basically similar to the model of the maximum peak shaving scheduling method, but there are slight differences in concept, which are explained as follows:
[0220] There are obvious advantages to adopting discarded wat...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com