Graphene building tower crane
A tower crane and graphene technology, applied in the direction of cranes, etc., can solve problems such as boom deformation, construction tower crane strength not suitable for construction requirements, tower tilting, etc., to achieve increased mechanical strength and improved operation Safety, strength-enhancing effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] Use graphene new materials to manufacture the graphene tower body of the construction tower crane, install the graphene lifting arm and the graphene balance arm on the upper part of the graphene tower body, install the balance weight on the graphene balance arm, and install the graphene balance arm on the graphene tower Install the operating room above the junction of the graphene boom and the graphene tower body, install the anemometer on the top of the graphene tower body, and install a graphene vertical hoisting rope with a length of 80 meters below the front end of the graphene boom. A graphene vertical hook is installed at the lower end of the graphene vertical lifting rope, and a 520-kg building material is lifted with the graphene vertical hook. Connect the graphene lifting arm and the graphene tower body with the graphene front cable-stayed horizontal load-bearing rope, and connect the graphene balance arm and the graphene tower body with the graphene rear cable-...
Embodiment 2
[0031] Use graphene new materials to manufacture the graphene tower body of the construction tower crane, install the graphene lifting arm and the graphene balance arm on the upper part of the graphene tower body, install the balance weight on the graphene balance arm, and install the graphene balance arm on the graphene tower Install the operating room above the junction of the graphene boom and the graphene tower body, install the anemometer on the top of the graphene tower body, and install a graphene vertical hanging rope with a length of 120 meters below the front end of the graphene boom. A graphene vertical hook is installed at the lower end of the graphene vertical lifting rope, and a 370-kg building material is lifted with the graphene vertical hook. Connect the graphene lifting arm and the graphene tower body with the graphene front cable-stayed horizontal load-bearing rope, and connect the graphene balance arm and the graphene tower body with the graphene rear cable-...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com