Low-heat asphalt for grouting plugging of large leakage quantity and high flow velocity karst and preparation method thereof
A technology with high flow rate and asphalt, applied in the field of grouting plugging materials, can solve the problems of great threat to the safety of construction equipment and personnel, poor controllability of the grouting process, and high temperature sensitivity, and achieves favorable safety protection and good resistance to water flow. performance and sealing performance, and the effect of low construction temperature
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0040] Embodiment 1, the raw material composition and weight ratio of this kind of low-heat bitumen used for large leakage and high flow rate karst grouting plugging are as follows:
[0041] 100 parts of asphalt;
[0042] 5 parts paraffin;
[0043] 100 parts of water;
[0044] 3 parts of cationic emulsifier;
[0045] 40 parts of cement.
[0046]
Embodiment 2
[0047] Embodiment 2, this kind of low-heat asphalt used for large leakage and high flow rate karst grouting plugging, its raw material composition and weight ratio are as follows:
[0048] 100 parts of asphalt;
[0049] 3 parts paraffin;
[0050] 100 parts of water;
[0051] 1 part cationic emulsifier;
[0052] 30 parts of cement.
[0053]
Embodiment 3
[0054] Embodiment 3, the raw material composition and weight ratio of this low-heat asphalt used for large leakage and high flow rate karst grouting plugging are as follows:
[0055] 100 parts of asphalt;
[0056] 4 parts paraffin;
[0057] 120 parts of water;
[0058] 2 parts of cationic emulsifier;
[0059] 60 parts of cement.
[0060]
PUM
| Property | Measurement | Unit |
|---|---|---|
| Softening point | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More