Multi-story high-rise assembled steel structure frame - prestressed centrally-braced system
A technology of central support system and steel structure frame, which is applied in building construction, construction, etc., can solve the problems of large pollution, material waste and long construction period in the construction process.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0066] The present invention is described in detail below in conjunction with accompanying drawing:
[0067] as attached figure 1 As shown, the splicing position of the new fabricated beam slab of the present invention is set in the middle of the main girder, where the shear force and bending moment are relatively small. From the perspective of structural mechanics, the setting of the splicing position is very reasonable.
[0068] as attached figure 2 And attached Figure 4 As shown, in the novel multi-high-rise assembled steel structure frame-prestressed central support system described in the present invention, the beams involved are equipped with hollow-type angle steel beams with channel steel webs, including angle steel upper and lower chords 1, channel steel webs Rod 2, the channel steel web is perpendicular to the chord, and the upper and lower ends of the web are welded to the angle steel legs of the upper and lower chords; all angle steel beams are fixed at interva...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com