Layered pulse pressure-charging plug removal device and method for oil filed water injection well

A technology of pulse pressurization and oilfield water injection, which is applied in earth-moving drilling, wellbore/well components, and production fluids, etc., can solve the problems of disordered water injection system, complicated process, and difficult to achieve, and achieves convenient operation, simple process, and increased production efficiency. Pressure adjustable effect

Active Publication Date: 2015-07-08
PETROCHINA CO LTD
View PDF10 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Existing technology 1: Automatic booster pump for oil field water injection, application number is 01140026.9, this technology introduces a booster pump for water injection wells, because it needs a low-pressure water injection network as an auxiliary, its implementation will inject a large amount of low-pressure water into the low-pressure well required water, causing turmoil in the water injection system, making it difficult to achieve
[0005] Existing technology 2: a pressure regulating water injection pump, the application number is 96249259.0, the principle and disadvantages are basically the same as the above patents, and it is difficult to implement
[0006] Prior art 3: Oilfield water injection pressurized water wheel pump, application number 96228470.X; prior art 4: in-well pressurized water injection method and its device, application number 89100282.0; prior art 5: pressure pulse oil well water injection device , the application number is 200610005334.3; prior art 6: supercharged water injection device, the application number is 201010114436.5; the above prior art 3-6, all need to add a power device to realize the injection well injection, the process is complicated and the cost is high

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Layered pulse pressure-charging plug removal device and method for oil filed water injection well

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0046] A layered pulse pressurization plugging removal device for oilfield water injection wells of the present invention is installed on the main water injection line, the high-pressure water injection pipeline and the water injection well; the first end of the high-pressure injection pipeline communicates with a main water injection line, and the second end communicates with The oil pipe valve connection of a water injection well; the oilfield water injection well layered pulse pressurization deblocking device. The device includes: a booster box, a low-pressure injection pipeline; The low-pressure chamber is provided with a piston, and communicates with the water injection main line through the first water inlet line and the second water inlet line respectively; the high-pressure chamber communicates with the high-pressure injection line through a high-pressure line, and communicates with the water injection well The first end of the low-pressure injection pipeline communicat...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a layered pulse pressure-charging plug removal device and method for an oil filed water injection well. The device is arranged onto a water injection main line, a high-pressure water injection pipeline and the water injection well. The device comprises pressure-charging boxes, a low-pressure water injection pipeline and a high-pressure water injection pipeline, wherein the pressure-charging boxes are respectively provided with a high-pressure chamber and a low-pressure chamber; a piston is arranged between the corresponding high-pressure chamber and the corresponding low-pressure chamber, and the high-pressure chamber and the low-pressure chamber are communicated with the water injection main line respectively through a first water inlet pipeline and a second water inlet pipeline; the high-pressure chambers are communicated with the high-pressure water injection pipeline through a high-pressure pipeline, and are communicated with the water injection well; the first end of the low-pressure water injection pipeline is communicated with the low-pressure chambers; the second end of the low-pressure water injection pipeline is connected with a sleeve valve of the water injection well; the high-pressure water injection pipeline, the first water inlet pipeline, the second water inlet pipeline, the high-pressure pipeline and the low-pressure water injection pipeline are respectively provided with a first retaining valve, a second retaining valve, a third retaining valve, a fourth retaining valve and a fifth retaining valve in sequence; and a pressure gage is arranged between the first retaining valve and an oil pipe valve. Pressure-charging plug removal treatment can be independently performed on a low water intake layer in the water injection well so as to improve a water injection profile.

Description

technical field [0001] The present invention relates to a technique of pulse pressurization and blockage removal for small layers of oilfield water injection wells, in particular to a technique for boosting and blockage removal of low water absorption layers in individual water injection wells to improve the stratification of oilfield water injection wells with water absorption profiles Pulse pressurization and blocking removal device and method thereof. Background technique [0002] The non-absorbent thickness of Block Jin 16 in Jinzhou Oil Production Plant of Liaohe Oilfield accounted for 30.4% of the perforated section in 2003, and rose to 53.6% in 2009. The non-absorbent thickness of Block Jin 99 accounted for 34.1% in 2003, and rose to 54.3% in 2009. In order to increase the thickness of the water-absorbing layer, it is necessary to increase the water absorption of the low-permeability layer. Three methods can be adopted: plugging the high-permeability layer (water inje...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E21B31/00E21B43/20
Inventor 高玉军
Owner PETROCHINA CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products