Load quick-cut control system
A technology for controlling systems and loads, applied in information technology support systems, power network operating system integration, climate sustainability, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] figure 1 , figure 2 , image 3 As shown, considering that the fault tripping is the direct starting condition for the fast switching of the entire load, so to judge the generator fault tripping, in addition to judging the position of the switch, the minimum load judgment is also added, and then considering the communication interruption of the unit processor or the processor In the case of a fault, the power cannot be collected, and the trip of the fault cannot be judged, so a processor communication interruption judgment logic is added. The power and position of the generator are collected by the local processor. The switch position collects a normally open contact and a normally closed contact at the same time, so as to avoid the possibility of misjudgment of fault tripping by only collecting one switch position. The purpose of judging the falling edge of the switch is to make the After a fault trip occurs, the load fast-cutting start is not maintained all the time...
Embodiment 2
[0026] Figure 4 As shown, the principle of load shedding judgment is based on the fault tripping, the current generator operating load P1+P2+P3 before the tripping (P1, P2, P3 are the power of No. 1, No. 2, No. 3 generators respectively), minus other The maximum total output TP of the operating unit is the load to be removed. Considering that the actual normal operation of the generator has large load fluctuations, especially the load fluctuations in the few seconds before the generator failure trip, P1\P2\P3 are taken from the 20 seconds to the first 10 seconds before the generator failure trip The average power ensures the rationality and reliability of data sampling.
Embodiment 3
[0028] Figure 5 As shown, the first round of low-cycle time mainly considers the time for the generator to automatically adjust after the fault trips, and it is recommended to be 3 seconds. Considering the possible risks after the first round of low cycle, it needs to be removed quickly, so it is recommended to set the time of the following low cycles to 0.3 seconds. The total load refers to the sum of the given load that can be shed, including the removed load.
[0029] Figure 6 As shown, this low cycle is used as a backup plan to consider the sudden insufficient output of power generation and the start of a large motor. The first round of low cycle time mainly considers the start of a large motor or the fluctuation of system frequency. After the round of low cycle, the possible risks need to be removed quickly, so it is recommended to set the time of the following low cycle to 0.3 seconds. The total load refers to the sum of the given load that can be cut, including the ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com