Kerbstone
A technology of curb stone and vertical plate, applied in the direction of side ditch/curb stone, etc., can solve the problems of loose foundation and poor drainage effect, and achieve the effect of good water permeability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0026] Such as figure 1 with figure 2 As shown, when there is less accumulated water in the road, most of the accumulated water can directly flow into the water flow trough, or first penetrate into the floor surface layer and / or the riser surface layer, and then flow into the water flow channel. When there is a lot of accumulated water in the road, the accumulated water cannot be discharged in time only through the water flow groove, and the road water may overflow the water flow groove; therefore, preferably, the bottom position of the water permeable part is not Higher than the top surface of the bottom plate. When the stagnant water in the water runner flows over the water runner, it can also be smoothly discharged from the water permeable part. According to the present invention, it is only necessary to ensure that the pore diameter of the porous structure of the permeable part is larger than the pore diameters of the porous structure of the bottom layer of the vertical pl...
Embodiment 1
[0043] This example is used to illustrate the curb stone provided by the present invention and its preparation.
[0044] Mix 1000g of perlite (average particle diameter of 3.5 mm), 100g of cement and 100g of water to obtain a mixture forming the bottom layer of the bottom plate and the bottom layer of the vertical plate; the mixture is laid on the channels with water flow grooves and through the two sides of the vertical plate. The steel curb bottom layer mold of the hole was cured at 40°C for 500 minutes to obtain an integral structure of the bottom bottom of the bottom plate and the bottom of the vertical plate. The thickness of the bottom of the bottom plate and the bottom of the vertical plate are both 10cm, and the hole diameter is 0.5 mm. The porosity is 15%.
[0045] Mix 1000g of silica sand (average particle diameter of 0.05mm), 100g of water-based epoxy resin (Bluestar New Material Wuxi Resin, E-44) and 5g of diethylenetriamine to obtain a mixture that forms the bottom sur...
Embodiment 2
[0049] This example is used to illustrate the curb stone provided by the present invention and its preparation.
[0050] 600g of ceramsite (average particle diameter of 7mm), 12g of silicate and 10g of water are mixed uniformly to obtain a mixture forming the bottom layer of the bottom plate and the bottom layer of the vertical plate; the mixture is laid on both sides of the vertical plate with water flow grooves The through-hole steel curb bottom layer mold was cured at 40°C for 500 min to obtain a bottom bottom and a bottom floor with an integrated structure. The thickness of the bottom bottom and the bottom of the vertical plate are both 9cm and the hole diameter is 5 The millimeter and porosity are both 30%.
[0051] 600g of silica sand (average particle diameter of 3mm), 12g of water-based polyurethane resin (Liaoning Nikkei Consulting Co., Ltd., F417505) and 0.24g of toluene diisocyanate were mixed uniformly to obtain a mixture of the floor surface layer and the vertical plat...
PUM
Property | Measurement | Unit |
---|---|---|
Hole diameter | aaaaa | aaaaa |
Hole diameter | aaaaa | aaaaa |
Hole diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com