A technology of modified asphalt and infusion bag, which is applied to building components, building insulation materials, buildings, etc., can solve the problem that the low-temperature performance of modified asphalt has not been studied, and achieve the effect of improving comprehensive performance and reducing costs.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0032] 1. Formula according to the mass ratio:
[0033] Base bitumen 100kg
[0034] Infusion bag film 4.5 kg
[0035] Nano montmorillonite 2kg
[0036] POE-g-MAH 1.5 kg
[0037] 2. Preparation
[0038]Heat and melt the base asphalt, keep the temperature at 170°C, add compatibilizer POE-g-MAH, mechanically shear at 500 rpm / min for 5 minutes; then add discarded disposable multi-layer co-extruded infusion bag film fragments, 500 Mechanically shear at a rotational speed of rpm / min for 10 minutes; then add nano-montmorillonite, send the mixture into a high-speed shearer, and mechanically shear at a rotational speed of 2000 rpm / min for 90 minutes; finally cool down to 130°C and place it for 40 minutes to prepare Obtaining the modified asphalt described in the present invention to obtain the modified asphalt described in the present invention.
[0039] Test the penetration according to GB / T0604-2000, test the softening point according to GB / T0606-2000, test the ductility accordi...
example 2
[0042] 1. Formula according to the mass ratio:
[0043] Base bitumen 100 kg
[0044] Infusion bag film 7kg
[0045] Nano montmorillonite 2kg
[0046] PP-g-(GMA-co-St) 2kg
[0047] 2. Preparation
[0048] Take base asphalt and heat and melt, keep the temperature at 210°C, add compatibilizer POE-g-MAH, and manually stir for 15 minutes; then add discarded disposable multi-layer co-extruded infusion bag film fragments, and manually stir for 10 minutes; then add nano-montmorillonite soil, the mixture was sent to a high-speed shearing machine, and mechanically sheared at a speed of 6000 rpm / min for 30 minutes; finally, the temperature was lowered to 100°C and left for 60 minutes to obtain the modified asphalt of the present invention.
[0049] Test the penetration according to GB / T0604-2000, test the softening point according to GB / T0606-2000, test the ductility according to GB / T0605-1993, use the AR-2000 rotational rheometer to test the complex viscosity at 65°C, this example ...
example 3
[0052] 1. Formula according to the mass ratio:
[0053] Base bitumen 100 kg
[0054] Infusion bag film 9kg
[0055] Nano montmorillonite 2kg
[0056] POE-g-MAH 1.5 kg
[0057] 2. Preparation
[0058] Take base asphalt and heat it to melt, keep the temperature at 190°C, add compatibilizer POE-g-MAH, mechanically shear at 400 rpm / min for 25 minutes; then add discarded disposable multi-layer co-extruded infusion bag film fragments, 100 Mechanically shear at a rotational speed of rpm / min for 25 minutes; then add nano-montmorillonite, send the mixture into a high-speed shearing machine, and mechanically shear at a rotational speed of 4000 rpm / min for 70 minutes; finally cool down to 100°C, place for 30 minutes, and Obtain the modified bitumen described in the present invention.
[0059] Test the penetration according to GB / T0604-2000, test the softening point according to GB / T0606-2000, test the ductility according to GB / T0605-1993, use the AR-2000 rotational rheometer to test...