Folded-line shape diversion pier of spillway
A diversion pier and broken line technology, applied in coastline protection, water conservancy engineering, sea area engineering, etc., can solve problems such as wall detachment, downstream water flow disorder, poor flow state, etc., achieve good water flow conditions, reduce construction difficulty, meet The effect of strength requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0028] θ1=26°34′, θ2=47°58′, θ3=18°51′, L1=3.75m, L2=8.4m, L3=3.75m, R1=0.15m, R2=0.15m, R3=0.75m , H1=4.2m, H2=4.02m, H3=0m, H0=8.22, Hw=3.37m, D=1.5m.
Embodiment 2
[0030] θ1=27°14′, θ2=52°14′, θ3=18°51′, L1=3.75m, L2=14m, L3=7.02m, R1=0.15m, R2=0.15m, R3=0.75m, R4=0.75m, H1=7m, H2=4.02m, H3=7.12m, H0=18.14m, Hw=6.95m, B=1.5m. The slope of the spillway is 1:20.
experiment example
[0032] A hydropower station project includes main dam, auxiliary dam, discharge structure, power generation and water diversion structure, and hydropower plant. The main dam is a concrete face gravel-rockfill dam. The spillway is arranged on the left bank and is open. The weir crest elevation is 1925.00m and the checked discharge is 407.33m. 3 / s. The river channel of this project is very characteristic, it is very narrow (only 12m), and the ratio of the spillway width to the channel width is very large, reaching 9 / 12=3 / 4. In addition, there is an 8m-wide pass at 70m downstream of the ridge. It is required to control the distance of the water tongue, which cannot be too large and must meet the requirements of the river. It is difficult to adapt to the characteristics of the river channel by conventional narrow-slit ridges. After experiments, the project finally adopts diversion piers + double narrow-slit energy dissipators.
[0033]The main difficulty of diversion pier + dou...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 