Embodiment 1
[0046] Embodiment 1: Novel rigid building template support composite structure, see Figure 1-Figure 13 , including bowl buckle frame, U-shaped top brace, main beam keel, auxiliary beam keel, and roof formwork. The main beam keel and auxiliary beam keel are connected to form a formwork support plane through movable connections, and the main beam keel and U-shaped top brace are connected to form a supporting whole , There is a bowl buckle frame under the U-shaped top support;
[0047] Among them, the main beam keel is composed of a jacket and a beam core. The jacket can slide along the beam core, and there are hanging grooves on both sides of the jacket; In the hanging groove, it forms a firm movable connection with the main beam.
[0048] The hanging groove is an L-shaped member, and the hanging groove and the jacket are welded. According to needs, the outer side of the hanging groove of the main beam keel can be hung with the auxiliary beam keel again, and then extend outwa...
Embodiment 2
[0050] Embodiment 2: basically the same as Embodiment 1, the difference is:
[0051] The length of the main beam keel can be adjusted, and the main beam keel is divided into four specifications according to the adjustable length range: 2.68m-4.39m, 2.28m-3.68m, 1.77m-2.88m, 1.12m-1.78m.
[0052] The sub-beam keel is divided into three specifications according to its length: 1.15m, 0.8m, and 0.4m. The sub-beams of these specifications ensure the supporting area and supporting weight. The wall surface gap between the main beam and the parallel main beam is not more than 290mm.
Embodiment 3
[0053] Embodiment 3: the construction method of rigid building formwork support composite structure, see Figure 1-Figure 13 .
[0054] 1. The construction process includes: construction preparation, bowl buckle frame erection, U-shaped top brace installation, main girder and auxiliary girder erection, leveling, on-site stacking test, formwork laying, formwork removal, etc.
[0055] (1) Construction preparation: The preparation work before support directly affects the construction speed, efficiency and construction quality, and the roof formwork should be prepared before installation.
[0056] According to the architectural drawings, calculate the supportable area and conduct formwork design; plan the specifications and quantities of products used according to the support structure area (see Table 2); review the load, calculation method, node structure and safety measures in the formwork structure design and construction plan; Carry out a comprehensive safety technical disclo...