Boom main arm composite structure, crane, and boom main arm composition method
A combined structure and combined method technology, applied in the direction of cranes, etc., can solve the problems of easy instability and low lifting performance of the fully extended boom, and achieve the effect of improving rigidity and lifting performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0033] It should be noted that, in the case of no conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and examples.
[0034] refer to figure 1 and figure 2 , is a structural schematic diagram of an embodiment of the combined structure of the boom main boom of the present invention.
[0035] like figure 1 As shown, the embodiment of the combined structure of the main boom of the boom of the present invention includes six jibs, the first jib 11, the second jib 12, the third jib 13, the fourth jib 14, the fifth jib 15 and The sixth section arm 16. In the condition of fully extended boom, except for the first boom 11, the extension length of each boom relative to the previous adjacent boom is determined by finite element analysis. The goal of finite element analysis is to make the stress level of each boom tend...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


