Later-construction method for inner wall of basement
A technology of lining wall and post-construction, applied in excavation, infrastructure engineering, construction, etc., can solve the problem that the lining wall cannot be smoothly constructed upward, and achieve the effect of improving construction quality, ensuring structural quality and shortening construction period
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The method for the construction behind the basement lining wall proposed by the present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments. Advantages and features of the present invention will be apparent from the following description and claims. It should be noted that the drawings are all in a very simplified form and use imprecise ratios, which are only used to facilitate and clearly assist the purpose of illustrating the embodiments of the present invention.
[0027] The core idea of the present invention is that, under the premise that the lining wall in the basement cannot be constructed at one time or the quality cannot be guaranteed at one time, the method provided by the present invention can effectively improve the construction quality of the lining wall and shorten the construction period; In the support stage and the structural construction stage, the upside-down reinforcement of the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com