Copper plate grounding grid antistatic terrazzo floor construction process
A construction technology, anti-static technology, applied in the direction of floors, buildings, building structures, etc., can solve the problems of long duration, high cost, and reduced cement strength.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The specific implementation manners of the present invention will be described in detail below in conjunction with the accompanying drawings.
[0029] Copper plate grounding grid anti-static terrazzo floor construction technology includes the following steps:
[0030] Step 1, cement ground base construction;
[0031] Step 2, brushing the insulation isolation layer;
[0032] Step 3, laying the ESD copper plate grounding grid;
[0033] Step 4, retain the ESD ground connection box;
[0034] Step 5, insert glass grid strips;
[0035] Step six, laying anti-static terrazzo surface.
[0036] The specific process of step one is:
[0037] 1) Before the construction of the cement-based ground base, the mortar blocks on the surface of the structural layer should be knocked and leveled, and the floating ash and dirt should be cleaned;
[0038] 2) When the ground base is designed with fine stone concrete, its strength grade should be ≥ C20; when cement mortar is used for desig...
PUM
Property | Measurement | Unit |
---|---|---|
thickness | aaaaa | aaaaa |
width | aaaaa | aaaaa |
length | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com