Post-grouting capped rigid pile and drainage body combined foundation treatment method
A foundation treatment and drainage body technology, which is applied in foundation structure engineering, soil protection, construction, etc., can solve the problems of insufficient soil bearing capacity between piles, uneconomical use, and large amount of rigid piles, so as to reduce deformation and damage, reduce dosage, and control the effect of late settlement
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] Embodiment is the ground reinforcement treatment of highway engineering, and its construction method is:
[0030] (1) in figure 1 In the process, the site is first leveled, and the horizontal drainage body 2 is laid on the surface of the soft soil foundation 1 .
[0031] (2) The vertical drainage body 3 is constructed in the soft soil foundation 1, and the top of the vertical drainage body 3 enters the horizontal drainage body 2 to ensure that the drainage systems are interconnected.
[0032] (3) Rigid piles 4 are constructed in the soft soil foundation 1 , and the top surface of the rigid piles 4 is lower than the upper surface of the horizontal drainage body 2 .
[0033] (4) Remove the horizontal drainage body 2 above the top surface of the rigid pile 4 and bury the grouting bag 5, the bottom surface of the grouting bag 5 contacts the rigid pile 4, and the top surface of the grouting bag 5 is flush with the top surface of the horizontal drainage body 2, like figure...