Precast concrete post grouting pile and grouting process

A technology of prefabricated concrete and post-grouting piles, which is applied in sheet pile walls, foundation structure engineering, construction, etc., and can solve the problems of high temperature and high pressure for pre-embedded pipes, high material requirements for pre-embedded pipes, and easy deviation of grouting pipes, etc. problems, to achieve the effect of reducing the actual amount of piles used, reducing the effect of soil squeezing, and reducing the construction period

Inactive Publication Date: 2013-04-03
建华建材(四川)有限公司
View PDF9 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This type of pile can improve the bearing capacity of friction piles less, because it only uses grouting at the bottom of the pile, and only the grouting pipe is pre-embedded in the center of the pile, and most of the injected grout is in the center of the pile. Bottom, the slurry is difficult to distribute on the side of the pile
The patent number is: ZL201220088468.7, the name is "a kind of post-grouting concrete prestressed hollow square pile" and the patent number ZL20220080923.9, the name is "a kind of post-grouting concrete prestressed hollow square pile". "The grouting pipe is pre-embedded during the prefabrication process of post-grouting concrete prestressed hollow square piles, and the grouting process can be carried out after the pile sinking construction of the pile foundation is completed." Since the prestressed hollow square piles are formed by centrifugal technology, the pre-embedded The grouting pipe is easy to deviate or even dislocate during high-speed centrifugation
In addition, because it needs 5-9 hours of high-pressure steam curing after centrifugal molding, the requirements for the material of the embedded pipe are relatively high, and it is difficult for the embedded pipe of ordinary materials to withstand high temperature and high pressure for a long time.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Precast concrete post grouting pile and grouting process
  • Precast concrete post grouting pile and grouting process
  • Precast concrete post grouting pile and grouting process

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0032] Such as Figure 1 to Figure 4 The prefabricated concrete post-grouting pile-compression pile mainly includes a post-grouting pile body 4, a steel cage skeleton 12, a flange 3, a post-grouting groove 7, a grouting hole 5, and a pile bottom filler 11 (rubber). The steel cage frame 12 is composed of longitudinal ribs 9 and surrounding ribs 8, flanges 3 are welded at both ends of the frame, a pile bottom post-grouting pipe 1 runs through the center of the frame, and four pipes run through four sides of the frame The post-grouting pipe 2 on the side of the pile is simultaneously poured with concrete and adopts a vibration forming process to form a solid prefabricated concrete post-grouting pile.

[0033] Among them, the longitudinal reinforcement adopts the mixed reinforcement of prestressed steel and non-prestressed steel; the surrounding reinforcement is a wire rod with a diameter of 6mm for construction; The plug 6; the flange 3 is a 20mm steel plate; the two end fa...

Embodiment 2

[0040] Such as Figure 5 to Figure 7 The shown prefabricated concrete post-grouting pile—uplift pile, runs through four grouting pipes on the four sides of the steel cage skeleton 12, and pours concrete at the same time and adopts a vibration molding process to form a solid precast concrete post. Grouting pile.

[0041] Among them, the longitudinal reinforcement is a mixed reinforcement of non-prestressed steel and glass fiber reinforcement (GFRP reinforcement); the surrounding reinforcement is a wire rod with a diameter of 8mm for construction; The plug 6; the flange 3 is a 24mm steel plate; the two end faces of the rear grouting pile are planes. The number of back grouting grooves is 4.

[0042] After sinking the above-mentioned uplift piles by using the prior art, the post-grouting pile body 4 is immediately grouted to ensure that the grouting slurry is fully bonded to the surrounding soil layer of the pile. Inject cement slurry through the grouting pipe or the specif...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a precast concrete post grouting pile which comprises a post grouting pile body, a reinforcement cage framework, flanges, a post grouting tank, a post grouting pipe, a grouting hole and a pile bottom filler, wherein the reinforcement cage framework comprises longitudinal ribs and surrounding ribs; one end or two ends of the framework are welded with the flanges; at least one post grouting pipe runs through the center or the side edge position of the framework or the center and the side edge position of the framework; one end of the post grouting pipe is provided with the grouting hole; the grouting hole is positioned in the post grouting tank; and the post grouting tank is arranged on the post grouting pile body. In the constructing process, the post grouting pile is sunken and immediately, cement paste or powder paste with a specific surface area of 2,500 to 6,500kg/cm<2> is injected into the post grouting pile body by the grouting pipe, so that sufficient adhesion of the grouted paste and a soil layer around the pile is ensured. The precast concrete post grouting pile can realize improvement on rock and soil common resistance of soil and the pile so as to further play bearing capacity of the pile; and meanwhile, the number of the used piles can be reduced and engineering cost is reduced.

Description

technical field [0001] The invention relates to a construction pile foundation material in the field of civil engineering, in particular to a prefabricated concrete post-grouting pile and a grouting process. Background technique [0002] The natural resources used for construction are becoming less and less, that is, the land is becoming more and more scarce, and the construction of civil projects is characterized by deep underground and high upper parts, and the requirements for natural foundations are getting higher and higher. Considering the safety of the project, engineering designers are becoming more and more cautious in the selection of pile types. At present, the concrete piles prefabricated in the factory mainly include prestressed concrete pipe piles, prestressed concrete hollow square piles, solid square piles, bamboo piles, steel pipe piles, steel pipe concrete piles, etc. The above pile foundation materials have high bearing capacity and convenient construction...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D5/50E02D15/04
Inventor 陈芳斌陈巧
Owner 建华建材(四川)有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products