Structure and Construction Method of Inland River Water Intake in Circulating Water System of Power Plant
A circulating water system and construction method technology, applied in water supply devices, drinking water devices, buildings, etc., can solve the problems of high cost of cofferdams, long construction period, etc., to ensure safe and reliable structure, simple construction scheme, and good stability Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] refer to Figure 1 to Figure 5 The inland river water intake structure of the circulating water system of the power plant shown includes a pile foundation 1 and a water intake head 2. The pile foundation 1 is composed of a plurality of fixed piles embedded in the inland river bed 3, and the upper ends of all the fixed piles are on the same horizontal plane The water intake head 2 is an integrated reinforced concrete frame structure, and the bottom of the water intake head 2 is provided with an installation groove 4 corresponding to the fixed pile of the pile foundation 1, and the water intake head 2 is directly fastened and fixed by using the installation groove 4 On the pile foundation 1, a sealed water collection well 7 is formed; a water inlet 5 and a water outlet 6 are provided on the side wall of the water intake head 2, and the water inlet 5 is arranged on the top of the sealed water collection well 7, and the water outlet 6 is provided At the bottom of the sealed...
Embodiment 2
[0044] The difference between the technical features described in Embodiment 2 and Embodiment 1 is that the inland water intake structure of the circulating water system of the power plant is built in the Hanoi area where the water flow is stable, and a triangle extending at the two ends of the main part of the water intake head 2 is omitted. The formed diversion structure 10. All the other are with embodiment 1.
[0045]The invention is applied to a water supply system of a large inland gas-fired power plant. The distance from the water intake to the shore is about 220m, the silt at the water intake is about 40m thick, and the coastal terrain is flat. The pile foundation 1 of the water intake head adopts 4 steel pipe piles with a diameter of 600mm and a pile length of 50m. The water intake head adopts the prefabricated concrete structure to be formed on the dry ground, and is hoisted and constructed on the water. The installation groove 4 reserved during the prefabrication ...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com