Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Main controlling factor analysis for shale oil production and earthquake prediction method and device

A technology of earthquake prediction and main control factors, applied in the field of oil and gas exploration, can solve the problems of low production efficiency, inability to determine the main control factors of shale oil drilling production, lack of analysis of main control factors and earthquake prediction equipment, etc., to improve oil recovery efficiency effect

Inactive Publication Date: 2014-12-10
CHENGDU UNIVERSITY OF TECHNOLOGY
View PDF1 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0025] The purpose of the embodiments of the present invention is to provide a method and equipment for analysis of main controlling factors of shale oil production and earthquake prediction, aiming at solving the lack of equipment for main controlling factors analysis and earthquake prediction in traditional shale oil production technology, Unable to determine the main controlling factors of shale oil drilling and low production efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Main controlling factor analysis for shale oil production and earthquake prediction method and device
  • Main controlling factor analysis for shale oil production and earthquake prediction method and device

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment

[0066] 1. Overview of shale oil:

[0067] 1.1. Characteristics of shale oil accumulation

[0068] ① Shale oil has the characteristics of "retention and accumulation" in situ

[0069] Solid mineral deposits (such as iron ore or coal mines) can be found wherever they are formed; conventional oil and natural gas often undergo multiple geological processes such as generation→migration→accumulation→accumulation. Shale oil and gas is a continuous oil and gas accumulation, which has the characteristics of "retention and accumulation";

[0070] In source rocks, only hydrocarbons within 14m of the sandstone reservoir can be effectively discharged (Tissot and Pelet). According to research by Jarvie et al., 40-50% of hydrocarbons in source rocks remain, while Hunt et al. The migration does not exceed 10%, so it is considered that shale oil and gas reservoirs are formed due to the low hydrocarbon expulsion efficiency of thicker shale, which causes oil and gas to "stay" in shale formatio...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a main controlling factor analysis for shale oil production and an earthquake prediction method and device. The main controlling factor analysis for shale oil production and the earthquake prediction method and device are characterized in that the main controlling factor analysis for shale oil production is capable of establishing a shale oil and gas reservoir accumulation mode which plagues scientific research workers from a long time by means of analyzing shale oil and gas accumulation conditions, oil and gas geological characteristics and oil and gas accumulation characteristics; the earthquake prediction method and device conducts prediction by selecting a targeted earthquake prediction technique to ultimately realize comprehensive prediction of oil and gas enrichment region of a shale oil reservoir in Langzhong area of Sichuan province; the main controlling factor analysis for shale oil production and the earthquake prediction device mainly comprises a driller, a lifting base, an acoustic detector, a camera, a sensor, an analysis computer and a storage printer. Furthermore, the main controlling factor analysis for shale oil production and the earthquake prediction method and device determines main controlling factors of shale oil drilling production in Daanzhai section of Langzhong area to predict favorable areas for oil and gas via a corresponding earthquake and geological prediction technique, thereby improving oil recovery efficiency and laying the foundation for the further exploration of shale oil and gas in Sichuan area.

Description

technical field [0001] The invention belongs to the technical field of oil and gas exploration, and in particular relates to a method and equipment for analyzing main controlling factors of shale oil production and earthquake prediction. Background technique [0002] Shale oil and gas refers to oil and gas that is self-generated and self-storage in argillaceous source rock formations without secondary migration, including oil and gas that occurs in source rock pores, natural fractures, carbonate rocks, and sandstone interlayers (6- 10% porosity, <0.1mdpermeability); conventional oil and gas refers to the formation of hydrocarbon accumulation in the reservoir after secondary migration, including tight oil and gas accumulated in tight reservoirs such as low-porosity and low-permeability sandstone and siltstone (6 -10%porosity, <0.1mdpermeability). [0003] 1 Overview of shale oil [0004] 1.1. Characteristics of shale oil accumulation [0005] ① Shale oil has the char...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G01V1/40
Inventor 王忠桃覃章健鲁红英吴静罗耀耀
Owner CHENGDU UNIVERSITY OF TECHNOLOGY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products