Watershed water ecological security monitoring pre-warning platform and watershed water ecological security monitoring pre-warning method
A technology for safety monitoring and water ecology, applied in general water supply conservation, forecasting, instruments, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0060] refer to figure 1 , the present embodiment is the aforementioned platform for water ecological security monitoring and early warning, which includes: starting from the data monitoring module, information preprocessing module, index system management module, model management module, water ecological comprehensive evaluation module, risk assessment and early warning The module and the risk plan management module are sequentially connected by one-way communication;
[0061] The data monitoring module is responsible for obtaining real-time monitoring data of the monitored area of the watershed from remote sensing satellites; the information preprocessing module interprets and inverts the real-time monitoring data to obtain water ecology that can characterize the monitored area of the watershed. Characteristic data of security status; the indicator system management module calculates the weight value of the received real-time monitoring data to obtain the weight value of...
Embodiment 2
[0072] This embodiment is an early warning method for a basin water ecological security monitoring and early warning platform, specifically implemented according to the following method:
[0073] S1, the platform system obtains the real-time monitoring data of the watershed monitoring area from the remote sensing satellite, and performs preprocessing;
[0074] S2, performing weight analysis on the received preprocessed real-time monitoring data to obtain the weight value of the monitoring data;
[0075] S3, judging whether the weight value of the monitoring data conforms to the standard weight range value of the corresponding index, if not, proceeding to S4, and if yes, ignoring the monitoring data;
[0076] S4, after confirming the risk source of the preprocessed real-time monitoring data corresponding to the weight value of the monitoring data, performing risk assessment, and obtaining a risk result;
[0077] S5, making risk early warning and emergency decision based on the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com