Chemical profile control method for horizontal well
A horizontal well and chemical technology, which is applied in earthwork drilling, wellbore/well components, production fluids, etc., can solve the problems of low-permeability oil layer production potential, rising comprehensive water cut in oil fields, and deterioration of reservoir heterogeneity, etc. problems, to achieve the effect of improving the construction process of profile control, improving the efficiency of sweep and ensuring the effect of profile control
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0032] This embodiment provides a chemical profile control method for a horizontal well, which is applied to an oil well TLM-1 in the Tarim Oilfield. CII and CIII small layers were put into production, with daily injection of 95m3, wellhead water injection oil pressure of 20.37MPa, and daily water injection of 105m 3 , accumulative water injection 11.33×10 4 m 3 . The water absorption profile of the well was tested by isotope and energy spectrum flow in June 2011 and September 2012 respectively. According to the comprehensive evaluation, the CIII layer is the main water absorption layer, and there are dominant water absorption channels in the layer. The test results show that the relative water absorption of CII and CIII layers is 18% and 82% respectively, and various tests show that the injected water rushes along the CIII layer.
[0033] Corresponding to one effective oil well TLM-11. Well TLM-11 is a horizontal well with a formation dip angle of 30 degrees. In August 20...
Embodiment 2
[0050] This embodiment provides a chemical profile control method for a horizontal well, which is applied to Yue16-9, a water injection well in Qinghai Oilfield, which is a horizontal well. Sublayers I, II, III, and IV were put into production, with daily water injection of 105 cubic meters, wellhead water injection oil pressure of 19MPa, and daily water injection of 105m 3 , accumulative water injection 20.53×10 4 m 3 square. The water absorption profile of the well was tested by isotope and energy spectrum flow in June 2009 and September 2011 respectively. According to the comprehensive evaluation, layers I and III are the main water absorption layers, and layers I and III are preliminarily determined to be deep control and flooding construction layers part. The test results show that the relative water absorption of layers I and III are 49% and 43% respectively.
[0051] Corresponding to a recent effective oil well is Yue15-27. Well Yue15-27 is a straight well with a f...