Method for constructing consolid road
A technology of anti-slip and road, which is applied in the direction of roads, roads, buildings, etc., can solve the problems of long construction time, high use cost, difficult construction, etc., and achieve the effect of fast construction speed and reduced construction cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0036] This embodiment provides a method for constructing a dredging-resistant road, and the specific method steps are: (1) First, digging a drainage ditch;
[0037] (2) Construct the roadbed and reinforce the whole roadbed against loosening force;
[0038] (3) After the subgrade reinforcement is completed, build road shoulders on both sides of the road;
[0039] (4) Laying anti-scavenging and stable soil, mixing, paving, and rolling to form an anti-scavenging and stable layer;
[0040] (5) Lay the surface layer at last and open to traffic.
[0041] In step (1), the slope ratio of the excavated drainage ditches is 1:3.
[0042] Drainage is the first priority of road engineering, especially for rural roads, generally there are no ditches designed, and the ditches of the roads should be done well to ensure smooth drainage.
[0043] It should be noted that the entire embankment should be able to exclude surface water, and the depth of the drainage ditch should be able to exclu...
Embodiment 2
[0048] In this embodiment, on the basis of the above-mentioned embodiments, the steps are further optimized. In step (2), the roadbed is reinforced through the process of road mixing, and the specific steps are as follows:
[0049] (3.1) Allocate the soil, sand and stones on site with road materials in proportion;
[0050] (3.2) Spray anti-fluidity soil stabilizer on prepared road materials;
[0051] (3.3) Mix well the road materials with anti-flooding soil stabilizer. During the mixing process, use a loader to mix well;
[0052] (3.4) Reshape and compact the road, and use a road roller to compact the road;
[0053] (3.5) After rolling, level the road and use manual combing to level the land;
[0054] (3.6) Finally, use a road roller to flatten the road surface.
Embodiment 3
[0056] In this embodiment, on the basis of the above-mentioned embodiments, the technological process of step (4) is further optimized, and the laying anti-flooding stabilized soil is passed through the factory-mixed technological method. The specific steps are as follows:
[0057] (4.1) Mix the soil, sand, stones, and anti-slip soil stabilizer in proportion in the mixing yard with a loader;
[0058] (4.2) After mixing, the anti-drainage engineering soil is formed, and the anti-drainage engineering soil is transported to the site to be paved;
[0059] (4.3) Evenly spread the anti-drainage engineering soil into an anti-drainage stable layer;
[0060] (4.4) Compact the soil that resists and stabilizes the soil.
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com