Quick foundation pile pouring and vibrating machine
A fast and foundation pile technology, applied in construction, sheet pile walls, foundation structure engineering, etc., can solve problems such as insecure quality, low construction efficiency, and high labor intensity, so as to ensure construction quality, reduce labor intensity, and improve construction safety effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] Such as Figure 1~4 Among them, a rapid pouring and vibrating machine for foundation piles includes a support frame 7, a hoisting device connected to a driving device 12 is provided on the support frame 7, a steel wire rope of the hoisting device is connected with a suspension frame, and the lower end of the suspension frame is provided with at least A tamping device 1 . With this structure, the tamping device 1 can be put into the concrete that has just been poured into the foundation pile pit 13 by the hoisting device to carry out the tamping operation. Thereby do not need construction personnel to go down in foundation pile hole 13. Described hoisting device is the wire rope reel 11 that is driven to rotate by driving device, is provided with wire rope on the wire rope reel 11, is also provided with brake 20 at one end of wire rope reel 11, adopts hydraulic brake in this example, because overall weight Not much, it is also feasible to use mechanical friction brakes...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 