Unlock instant, AI-driven research and patent intelligence for your innovation.

Long-term load prediction device and method in power grid with multiple sources

A load forecasting, medium- and long-term technology, applied in the direction of forecasting, instrumentation, data processing applications, etc., can solve the problem of failure to consider new energy grid access forecasting methods and independent devices, lack of significance and regularity of factor characteristics, error learning, etc. question

Active Publication Date: 2015-03-25
STATE GRID CORP OF CHINA +2
View PDF3 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Existing technologies mostly use prediction methods based on learning and training to predict the total load demand of the power grid in a certain period. However, the methods currently used generally have the problem of inaccurate prediction.
In this type of prediction method, the core link is the training of the learner. In order to ensure the calculation speed of the prediction, the weak classification method is often used to construct the learner, and the weak classifier may have wrong judgments on the classification of sample features, resulting in wrong learning.
Since the medium and long-term load demand is affected by many factors such as power grid operation mode, power supply composition, load type, regional economic development level, administrative planning, etc., its factor characteristics generally lack significance and regularity, which leads to many current forecasting methods. Serious, it cannot be accurately applied to medium and long-term load demand forecasting problems
[0004] So far, for medium and long-term load forecasting problems, methods such as intelligent learning algorithms, gray system theory, expert systems, and support vector machines have been mainly used. There are no forecasting methods and independent devices that consider a large number of new energy sources connected to the power grid, and only a large amount of historical data is used. There is no differential input calculation, no analysis and selection of medium and long-term load forecasting factors for the specified power grid (including multi-source power grid), the result has large errors and low reliability

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Long-term load prediction device and method in power grid with multiple sources
  • Long-term load prediction device and method in power grid with multiple sources
  • Long-term load prediction device and method in power grid with multiple sources

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0098] Embodiments of the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0099] The overall structure of the medium and long-term load forecasting device in the multi-source power grid in this embodiment is as follows: figure 1 shown. Including: dual CPU unit 1, GPRS communication unit 2, storage unit 3 and human-computer interaction unit 4. Specifically be provided with double CPU unit 1, GPRS communication unit 2, storage unit 3, man-machine interaction unit 4 and power supply unit in device box; Wherein, double CPU unit is respectively connected with GPRS communication unit, man-machine interaction unit, power supply unit, The storage unit is connected; and the power supply unit is powered by a 12V storage battery.

[0100] The human-computer interaction unit 4: used to obtain regional economic data and meteorological data, wherein the economic data includes: total population, gross value of the secondary indus...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the field of long-term load prediction in an electric power system, and particularly relates to a long-term load prediction device and method in a power grid with multiple sources. A double-CPU unit, a GPRS communication unit, a storage unit, a human-computer interaction unit and a power unit are arranged in a device box, wherein the double-CPU unit is connected with the GPRS communication unit, the human-computer interaction unit, the power unit and the storage unit, and power supply is achieved through the power unit. Through the device and method, the relation between various factors and a prediction result can be objectively reflected, and a high-dimensional characteristic space is built; a low-dimensional characteristic having best distinguishing capacity is extracted from the high-dimensional characteristic space in a combined and optimized mode, excessive learning can be avoided to the maximum extent, and algorithm efficiency is improved; a load prediction process can be faster and more effective, long-term load prediction accuracy degree in the power grid with the multiple sources can be improved easily, and therefore match of power generation areas in the power grid can be adjusted, dispatch of electric network power flow is performed, and the overall power generation level of the power grid in the area can meet the overall requirement of loads in the area in future.

Description

technical field [0001] The invention belongs to the field of medium and long-term load forecasting in electric power systems, and in particular relates to a medium- and long-term load forecasting device and method for a power grid with multiple sources. Background technique [0002] At present, my country is in the stage of vigorously developing new energy sources, and the grid structure is in a period of rapid development and construction. The total load demand of the grid is the basic work of urban grid planning, which determines the future demand for electricity in cities and the power supply capacity of future urban grids. The level of accuracy directly affects the quality of grid planning. Therefore, the forecast of the total load demand has become one of the main links in the construction of the power grid. [0003] The existing technology mostly adopts the prediction method based on learning and training to predict the total load demand of the power grid in a certain ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q50/00G06Q50/06
CPCG06Q10/04G06Q50/06
Inventor 张明理吴冠男徐建源张子信宋卓然梁毅
Owner STATE GRID CORP OF CHINA