A curb stone concrete prepared with steel slag powder and slag powder
A technology of slag powder and steel slag powder, applied in the direction of sustainable waste treatment, solid waste management, climate sustainability, etc., can solve the problems of destroying the natural environment, quarry without greening vegetation, environmental pollution, etc., to reduce natural pollution Effects of environmental damage, reduction of over-exploitation of resources, and reduction of production costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0021] [Implementation 1] A curbstone concrete prepared with steel slag powder and slag powder
[0022] Add 330kg of 42.5 grade ordinary Portland cement, 814kg of steel tailing slag, 900kg of slag sand, 96kg of slag powder, 48kg of steel slag powder, 209kg of water, and 5.3kg of water reducing agent to each cubic meter of concrete, of which the specific surface area of steel slag powder is 450m 2 / kg, the specific surface area of slag powder is 400m 2 / kg.
[0023] After weighing the above raw materials according to the proportion, put them into the mixer, and mix them evenly to get the required concrete. The strength of the concrete prepared in this example meets the requirements of C30 concrete, and the strength of the curb made by it is 25.2 MPa in 7 days and 40.6 MPa in 28 days.
Embodiment 2
[0024] [Implementation 2] A curbstone concrete prepared with steel slag powder and slag powder
[0025] Add 237kg of 42.5 grade ordinary Portland cement, 814kg of steel tailing slag, 900kg of slag sand, 140kg of slag powder, 96kg of steel slag powder, 189kg of water, and 5.3kg of water reducer to each cubic meter of concrete, of which the specific surface area of steel slag powder is 450m 2 / kg, the specific surface area of slag powder is 400m 2 / kg.
[0026] After weighing the above raw materials according to the proportion, put them into the mixer, and mix them evenly to get the required concrete. The strength of the concrete prepared in this example meets the requirements of C20 concrete, and the strength of the concrete curb produced therefrom is 15.6 MPa in 7 days and 31.6 MPa in 28 days.
Embodiment 3
[0027] [Implementation 3] A curbstone concrete prepared with steel slag powder and slag powder
[0028] Add 330kg of 42.5 grade ordinary Portland cement, 900kg of steel tailing slag, 900kg of slag sand, 96kg of slag powder, 48kg of steel slag powder, 142kg of water, and 5.3kg of water reducing agent to each cubic meter of concrete, of which the specific surface area of steel slag powder is 450m 2 / kg, the specific surface area of slag powder is 400m 2 / kg.
[0029] After weighing the above raw materials according to the proportion, put them into the mixer, and mix them evenly to get the required concrete. The strength of the concrete prepared in this example meets the requirements of C40 concrete, and the strength of the concrete curb produced therefrom is 35.2 MPa in 7 days and 51.6 MPa in 28 days.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More