A Stress Controlled Reinforced Inclusion Structure and Its Ground Treatment Construction Method
A technology of stress control and inclusions, applied in infrastructure engineering, construction, soil protection, etc., can solve the problems of high construction technology, difficulty and stability requirements, limited application range, long construction period, etc., and achieve simple and fast construction , low cost and less excavation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] Example 1: A stress-controlled reinforced inclusion structure, comprising at least one layer of geotechnical mat and a stress application device; the geotechnical mat includes a geogrid 1, a geotechnical non-woven fabric and a filler from the outside to the inside, and the geotechnical non-woven fabric is arranged on the geogrid On the inner side of grid 1, the filler is placed in the geotextile non-woven fabric; the filler can be waste soil on site or purchased soil.
[0036] Stress applying device comprises upper and lower branch pressure plate 21,22 and is arranged between upper and lower branch pressure plate 21,22 and is used for the tension member that upper and lower branch pressure plate 21,22 is tensioned, and upper branch pressure plate 21 is arranged on On the upper surface of the geotechnical pad, the lower support plate 22 is arranged on the lower surface of the geotechnical pad. Under the action of the tension member, the upper supporting plate 21 and th...
Embodiment 2
[0044] Example 2: A construction method for foundation treatment, using the stress-controlled reinforced inclusion structure described in Embodiment 1, specifically comprising the following steps:
[0045] 1) First place the lower support plate 22 in the leveled construction site, and connect the lower support plate 22, the lower connecting rod 4, the spring 6 and the upper connecting rod 5 with bolts 3 from bottom to top;
[0046] 2) Pass the casing 7 through the upper connecting rod 5, the spring 6 and the lower connecting rod 4 sequentially from top to bottom;
[0047] 3) Lay the geogrid 1 between the lower support plate 22 and the casing 7, lay the geonon-woven fabric on the geogrid 1, and then backfill the multi-layer filler (soil filler) on the geonon-woven fabric, rolling Tamping, the thickness of each layer of filler (soil filler) is 20cm-60cm, construction from bottom to top layer by layer, until the designed thickness, connecting the edge of the laid geogrid 1 to f...