A technology of integral pouring and construction method, which is applied in shaft equipment, earthwork drilling, wellbore lining, etc. It can solve the problems that the position of the final hole is difficult to exceed the range of the barren diameter, the radius of the curtain is small, and the grouting effect is poor.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment approach 1
[0025] Specific embodiment one: combination figure 1 To explain this embodiment, the wall seat of the integral casting section of the vertical shaft described in this embodiment includes the outer wall 1, the inner wall 2, the wall seat 3, two water detection orifice pipes 4, and the grouting pad 5, two water detection The orifice pipes 4 are respectively buried in the grouting pad 5, the well wall base 3 is connected with the outer wall of the well, the bottom end of the well wall base is flush with the bottom end of the well inner wall 2, the well inner wall 2 is connected with the well outer wall 1, and the upper end of the well inner wall 2 It is flush with the upper end surface of the outer wall of the well; the outer well wall 1, the inner well wall 2 and the well wall seat 3 are made of concrete and steel bars.
[0026] Effects of this implementation:
[0027] The basic plan of this implementation mode is that the shaft is dug and built to the wall seat, and the large secti...
specific Embodiment approach 2
[0031] Specific embodiment two: this embodiment is different from specific embodiment one in that: the height of the outer well wall 1 is the freezing depth of the shaft or the height of the designed casing wall section is designed according to actual geological conditions; the inner diameter H4 of the outer well wall 1 is 6m ~12m; the wall thickness H8 of the outer wall 1 of the well is 0.35~0.6m. Other steps and parameters are the same as in the first embodiment.
specific Embodiment approach 3
[0032] Specific embodiment three: This embodiment is different from specific embodiment one or two in that: the inner wall 2 of the wellbore is the freezing depth of the wellbore or the height of the designed casing wall; the inner diameter (net diameter of the wellbore) H6 of the well inner wall 2 is 5m~10m ; The wall thickness H7 of the inner wall 2 of the well is 0.5 to 1.0m. The other steps and parameters are the same as in the first or second embodiment.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com