The construction method of the communication channel construction using the combination of the mjs method and the freezing method
A technology for connecting passages and construction methods, which is applied in the field of connecting passages in subway inter-tunnel tunnels, can solve problems such as hidden dangers of safety and sinking, and achieve the effects of improving performance, good stratum adaptability, and small loss of strength and stiffness.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0027] Embodiment 1: as figure 1 As shown, it is a schematic flow chart of a new construction method that is suitable for the construction of subway inter-section tunnel communication passages according to the present invention and uses the combination of the MJS method and the freezing method. The inventive scheme combines the advantages of the MJS method and the freezing method, and provides A new communication channel construction method that is safer, more efficient, and has lower long-term costs.
[0028] Such as Figure 2~Figure 6 As shown, the implementation steps of the new communication channel construction method include: ① Open the flange interface reserved on the steel pipe sheet, and construct MJS reinforcement piles below the communication channel bottom plate; Reinforce the soil above; ③ After the strength of the frozen reinforcement area meets the design requirements, install the prestressed steel frame; ④ Pull apart the steel pipe sheet and use the mining met...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 