Embodiment 1
[0055] Example 1: Vulnerability assessment of substations:
[0056] (1 Overview:
[0057] A substation is located in the southwest of a certain city, northeast of Songjiang District, with geographical coordinates: 121.1 degrees east longitude, 31.08 degrees north latitude. The climate of this area belongs to the northern subtropical marine monsoon climate, with four distinct seasons throughout the year, the average temperature is 15.7 degrees Celsius, the annual rainfall is 1123 mm, and the annual thunder and lightning days are 30.1 days. There are no major disasters recorded in history, such as earthquakes, strong typhoons, floods, etc. occurrence of natural disasters. The substation covers an area of 91,635 square meters, and the building area is 3,831 square meters. The substation consists of three voltage levels of 500 / 220 / 35 kV, and the design prospect of the main transformer is to install 4 groups of 500 kV main transformers. The 500 kV long-term plan is a double-se...
Embodiment 2
[0065] Example 2: Vulnerability assessment of transmission lines
[0066] (1 Overview:
[0067] A transmission line starts from Yanghang Substation in a certain city and ends at Waigaoqiao Power Plant in the city, with a total length of 20,740m. The whole line is erected with double circuits.
[0068] Since the line project is located in the suburbs of a certain city, it is inevitable that there are many intersections across the whole line. In addition to a large number of residential houses and factory buildings crossing across, it also crosses highways, waterways, railways, power lines, communication lines, outer ring forest belts, urban roads and other facilities many times. Hydrological and geological conditions: the tortuous coefficient is 1.5. Terrain: 70% flat land, 10% river network, 20% swamp. Geological conditions: average. Traffic conditions: good. The area passed by the line belongs to the edge of the dish-shaped land in the Taihu Lake Basin. The water system ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com