An initial rainwater and flow system technology, applied in waterway systems, sewer systems, chemical instruments and methods, etc., can solve the problems of complex operation, poor economy and reliability, etc., and achieve reliable switching of working conditions, high reliability and low cost low effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] Embodiment 1: as Figure 1 to Figure 12 As shown, an initial rainwater abandonment system of the present invention includes a water inlet pipe 1, a first shunt pipe 2, a first liquid level control device 3, a second shunt pipe 6, an emptying pipe 7, a second liquid level control device 8, Outlet pipe 10, the first connecting pipe 11, the second connecting pipe 12, the first sump 4, the second sump 14; The head end is connected; the tail end of the first diversion pipe 2 leads into the first sump 4, and the rainwater can be diverted to the first sump 4; the tail end of the second diversion pipe 6 leads into the second sump 14, the rainwater can be diverted to the second sump 14; the first liquid level control device 3 is installed on the first shunt pipe 2; the second liquid level control device 8 is arranged at the lower part of the second sump 14, and the The head end of the pipe 7 leads to the bottom of the first sump 4, the tail end of the vent pipe 7 communicates w...
Embodiment 2
[0047] Embodiment 2: as Figure 1 to Figure 12 As shown, as a preferred embodiment of the present invention, on the basis of Example 1, the system of the present invention is further provided with a first control valve 13 installed on the first connecting pipe 11 . By adjusting the opening degree of the first control valve 13, the rainwater emptying time of the first sump 4 can be controlled. The first control valve 13 can be a copper ball valve, such as the Q11F-16T brass ball valve produced by Shanghai Neng Valve Co., Ltd., or a gate valve, such as the Z40H national standard gate valve produced by Shanghai Huatong Valve Co., Ltd.
Embodiment 3
[0048] Embodiment 3: as Figure 1 to Figure 12 As shown, as a preferred embodiment of the present invention, on the basis of Example 1, the system of the present invention is further provided with a second control valve 15 installed on the second connecting pipe 12 . By adjusting the opening degree of the second control valve 15, the rainwater emptying time of the second sump 14 can be controlled. The second control valve 15 can be a copper ball valve, such as the Q11F-16T brass ball valve produced by Shanghai Neng Valve Co., Ltd., or a gate valve, such as the Z40H national standard gate valve produced by Shanghai Huatong Valve Co., Ltd.