A construction device and mud-based technology, which is applied in filling, construction, and infrastructure engineering, can solve the problems of cumbersome dredging mud filling procedures and long construction periods, and achieve the effects of saving construction periods, simple structure, and reducing treatment processes
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0018] A building dredging mud foundation pit filling material spraying and mixing construction device, comprising a plurality of guide rails 1 evenly distributed and symmetrically arranged on the wall of the foundation pit, slide blocks 3 are buckled on the guide rails 1, and the main slurry pipe 6 is connected to the symmetrical Between the two sliders 3, a pulley 2 contacting the guide rail 1 is installed on the inner surface of the slider 3, and branch nozzles 4 and stirring plates 5 are uniformly arranged on the main slurry pipe 6. The stirring sheet 5 is rectangular.
[0019] There is also a transition channel 9 inside the slider 3, the inlet end of the transition channel 9 is connected with the grouting pipe 7, and the outlet end is connected with the main grout pipe 6 with the grout discharge pipe 8; the top side of the foundation pit is equipped with a motor 11. A gear 14 is provided at one end of the main slurry pipe 6, and a transmission chain 10 is connected betwee...